Differences between revisions 2 and 3
Revision 2 as of 2020-09-25 06:28:45
Size: 4804
Comment:
Revision 3 as of 2020-09-25 06:57:00
Size: 4821
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
Line 20: Line 21:
   * Continued to 30th Sep.
Line 21: Line 23:
   * The spectrum of the error signal of the ALS DARM was improved in higher frequency region
   * Now ASC control was implemented using TMS X/Y
    * Stable arm alignment
   * - 25th Sep.
  * Occasional day
   * 26th- Sep.
  * Preparation for O4 work
   * ALS DARM and Find IR resonance
   * PRCL, SRCL control

 * Preparation for O4 work
  * Toward opening the chamber
   * FFU on with temperature control
  * Help the VIS cleaning
   * Cleaning the PEMs
Line 30: Line 33:
  * Situation is unclear, I will explain in this meeting.
Line 44: Line 46:
  * PTEP (2) : noise budget(K.Yamamoto) [[https://docs.google.com/spreadsheets/d/1Lz5RNxdjOhdZp6CBef-USUUPmyNTrhww9a7u39W7PSI/edit?usp=sharing|Check list]], [[https://gokagra.slack.com/archives/C015M111B5G|slack]] '''<<Analysis ON GOING>>'''   * PTEP (2) : noise budget(K.Yamamoto) [[https://docs.google.com/spreadsheets/d/1Lz5RNxdjOhdZp6CBef-USUUPmyNTrhww9a7u39W7PSI/edit?usp=sharing|Check list]], [[https://gokagra.slack.com/archives/C015M111B5G|slack]] '''<<Analysis is ongoing>>'''
Line 54: Line 56:
  * PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) '''<<Referee comments>>'''   * PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) '''<<Submitted>>'''
Line 64: Line 66:
   * Cleaning the center area
Line 66: Line 69:
   * Cooler ON, compressor ON, FFU ON, ...
Line 68: Line 72:
  * [[KAGRA/Subgroups/PEM/GNDmeeting|GND issue]]
     * We found new ground in the center area
     * We started the
rack design with AEL people
    * cabling ([[https://github.com/gw-pem/kagra-pem/issues/204|github204]])
    * ondotori ([[https://github.com/gw-pem/kagra-pem/issues/205|github205]])
 
* water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])
      * Discussion with Furuta-san & a company is started
    * read out of the lightning sensor ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]])
    * Infrasound monitor @ Atotsu, Mozumi, (+ Toyama?)
    * RF monitor
    * tiltmeter
 
* RI detector
   * Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
      * cosmic-ray : plastic scintillator?
   * gamma/neutron : 新学術地下宇宙
      * start from a geiger counter?
  * gravity gradient (Newtonian noise)
      * Superconducting Gravimeter
   * TOBA
   * [[KAGRA/Subgroups/PEM/GNDmeeting|GND issue]]
    * We measured the potential difference for SRM and PR2 rack
     * Need the investigation more
* water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])
    * Discussion with Furuta-san & a company is started
     * When will company people come?
* read out of the lightning sensor ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]])
   * Infrasound monitor @ Atotsu, Mozumi, (+ Toyama?)
   * RF monitor
   * tiltmeter
* RI detector
    * Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
    * cosmic-ray : plastic scintillator?
    * gamma/neutron : 新学術地下宇宙
    * start from a geiger counter?
   * gravity gradient (Newtonian noise)
    * Accelerometer for wall
    * Relative temperature monitor
    * Many seismometers
  
* Superconducting Gravimeter
    * TOBA
Line 88: Line 94:
  * Large speaker @ End station
  * Magnetic injection by large coil
   * Large speaker @ End station
   * Magnetic injection by large coil
Line 92: Line 98:
   * Yokozawa
  * Potential difference measurement at SRM and PR2 racks
Line 95: Line 102:
  * Contact with Robert about LIGO PEM paper.
  * PRCL BPC lime subtraction : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14987|klog14987]]
    * Contact with Robert about LIGO PEM paper.
    * PRCL BPC lime subtraction : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14987|klog14987]]
Line 98: Line 105:
  * Waiting a reply from the company.     * Waiting a reply from the company.

Weekly PEM meeting

Agenda

Conference issue

  • KIW7
    • The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
    • Yokozawa is supported by C2C program
    • If you have interested in, please contact to Yokozawa
  • (Next JPS meeting is also online-meeting) 

General issue

  • Interferometer status
    • RSE lock trial
      • Continued to 30th Sep.
      • New suspension damping (modal damping)
      • ALS DARM and Find IR resonance
      • PRCL, SRCL control
  • Preparation for O4 work
    • Toward opening the chamber
      • FFU on with temperature control
    • Help the VIS cleaning
      • Cleaning the PEMs
  • Working style (COVID-19 related)
    • Some collaborator came to Kamioka. Please contact to Yokozawa if you plan to go to Kamioka.
      • Fujikawa-san is staying in Kamioka now
  • Useful management tools
    • Easy communication : Slack
      • We want to start using the slack by communication. I will send the message to candidate
    • Task management : GitHub

    • Software management : GitHub

    • Papers : Overleaf
    • Street view : Holobuilder

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>

    • Environmental part
      • Acoustic noise : Refer our PEM injection paper.
      • Seismic noise : summarise the actual seismic nois during O3GK? (who?)
      • OMC leg vibration : 12th - 16th Sep. ?
      • AC power lines : Coherence analysis is done (http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848, Washimi)

      • Magnetic noise : skipped in this paper?
      • Newtonian : seismic newtonian -> from PTEP1 (or Francisca?) / water fluid newtonian -> skipped / air density -> skipped

    • Line noise investigation
      • violin mode : Details of the RMS value will be not discuss in PTEP2.
  • PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>

  • Acoustic injection paper (Washimi) <<WRITING>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start investigation>>

Preparation for O4

  • PEM tasks for O4 will be discussed after this meeting with SEO
    • GND issue
    • Cabling issue
    • Cleaning the center area
  • Temperature control
    • Cooler ON, compressor ON, FFU ON, ...
  • for O4 preparation
    • GND issue

      • We measured the potential difference for SRM and PR2 rack
        • Need the investigation more
    • water fluid (github207)

      • Discussion with Furuta-san & a company is started

        • When will company people come?
    • read out of the lightning sensor (github182)

    • Infrasound monitor @ Atotsu, Mozumi, (+ Toyama?)
    • RF monitor
    • tiltmeter
    • RI detector
      • Rn : contact person -> Guillaume Pronostさん (ICRR, SK)

      • cosmic-ray : plastic scintillator?
      • gamma/neutron : 新学術地下宇宙
      • start from a geiger counter?
    • gravity gradient (Newtonian noise)
      • Accelerometer for wall
      • Relative temperature monitor
      • Many seismometers
      • Superconducting Gravimeter
      • TOBA
  • PEM injection for O4
    • Large speaker @ End station
    • Magnetic injection by large coil

Progress report

  • Yokozawa
    • Potential difference measurement at SRM and PR2 racks
    • Washimi
      • Aacoustic injection paper overleaf

        • Contact with Robert about LIGO PEM paper.
        • PRCL BPC lime subtraction : klog14987

      • Water fluid monitor JGW-T2011949

        • Waiting a reply from the company.
      • Lightning sensor
    • Fujikawa
      • Lock loss study
    • Kume
      • ICA analysis -> suspended until JPS

    • Omicron and hveto study(Someone)

Place for memo

KAGRA/Subgroups/PEM/Meeting/200925/Agenda (last edited 2020-09-25 16:25:19 by tatsuki.washimi)