Differences between revisions 3 and 4
Revision 3 as of 2020-09-28 06:25:52
Size: 428
Comment:
Revision 4 as of 2020-09-28 06:39:51
Size: 967
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
=== Agenda === === Minutes ===
Line 11: Line 11:
 * KAGRA schedule
  * 5th Oct. - 12th Oct. Start the cleaning
 * KAGRA schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/G2012041/001/ChamberOpen-Schedule200925-2.pdf|JGW12041]]
Line 14: Line 13:
  * 8th Oct. Warming up cryogenic ducts(IX, IY, EY)   * 5th Oct. - 12th(19th) Oct. Start the cleaning
* 8th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
Line 16: Line 16:
  * 19th Oct. - 23rd Oct. Clean work by company
  * 22nd Oct. - 25th Oct. break vacuum
  * 26th Oct. - Open chambers
Line 18: Line 21:
  * PEM measurement during blackout

  * Lock loss study
   * control loop of the ETMX MNR?

 * Fujikawa will visit Kamioka from 4th Oct. to 17th Oct.

 * ICA analysis
  * PR booth injection analysis
  * Now frequency domain -> move to time domain

 * Next PEM meeting 17:00- 2nd Oct.

Minute of PEM meeting


  • Date: 2020/09/25 17:00-18:00(JST)
  • Attendance: Yokozawa, Washimi, Ohkawa, Fujikawa, Oshino, Yokoyama, Kume
  • Regular meeting

Minutes

  • KAGRA schedule JGW12041

    • - 7th Oct. RSE lock trial
    • 5th Oct. - 12th(19th) Oct. Start the cleaning
    • 8th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
    • 14th Oct. blackout (13th, 15th working date for blackout)
    • 19th Oct. - 23rd Oct. Clean work by company
    • 22nd Oct. - 25th Oct. break vacuum
    • 26th Oct. - Open chambers
  • Call for discussion
    • PEM measurement during blackout
    • Lock loss study
      • control loop of the ETMX MNR?
  • Fujikawa will visit Kamioka from 4th Oct. to 17th Oct.
  • ICA analysis
    • PR booth injection analysis
    • Now frequency domain -> move to time domain

  • Next PEM meeting 17:00- 2nd Oct.