Weekly PEM meeting
- 2020/10/02(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- Maybe online style for Japanese member
- (Next JPS meeting is also online-meeting)
General issue
- Interferometer status
- RSE lock trial
- Continued to 7th Oct. at maximum
- New suspension damping (modal damping)
- ALS DARM
- More stable DRMI operation than before.
- RSE lock trial
Interferometer schedule JGW12041
- - 12th Oct. RSE lock trial
- 5th Oct. - 19th Oct. Start the cleaning
- 15th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
- 14th Oct. blackout (13th, 15th working date for blackout)
- 19th Oct. - 23rd Oct. Clean work by company
- 22nd Oct. - 25th Oct. break vacuum
- 26th Oct. - Open chambers
- Working style (COVID-19 related)
- Some collaborator came to Kamioka. Please contact to Yokozawa if you plan to go to Kamioka.
- KAKENHI proposal limit
- NAOJ : Oct. 8
- ICRR : Mostly end of Oct.(4th week deadline)
- JSPS : Nov. 5 16:30 JST (final limit)
Discussion item
- Some measurement if we can lock the DRFPMI
- Acoustic injection with portable PEMs
- Noise investigation
- PEM measurement during blackout
Discussion in the report by Washimi JGW-G2012095
- Prepare the DAQ during blackout
- Seismometer + magnetometer + Infrasound microphone + GND
- PEM DAQ racks
- Use only IX and IY racks
- Move the position of IX and IY racks
- New PEMs toward O4
- Many microphone
- Not only tables but also booth
- Position of magnetometer
- Position of seismometer
- Additional PEMs to PSL room
- 120Hz noise
- glitch study
- Many microphone
- Lock loss study
- control loop of the ETMX MNR?
- If you have new idea or discussion item, please write here
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
- Environmental part
- Acoustic noise : Refer our PEM injection paper.
We can discuss whether we use the result of pre-O3 study for the noise budget paper.
- Seismic noise : summarise the actual seismic nois during O3GK? (who?)
OMC leg vibration : 12th - 16th Sep. ?
AC power lines : Coherence analysis is done (http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848, Washimi)
- Magnetic noise : skipped in this paper?
Newtonian : seismic newtonian -> from PTEP1 (or Francisca?) / water fluid newtonian -> skipped / air density -> skipped
- Acoustic noise : Refer our PEM injection paper.
- We will held a noise budget meeting to summarize the current status, before the starting of heavy mine work. Details will be announced by KYamamoto-san(ToyamaU) soon later.
- Environmental part
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<WRITING>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start investigation>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Cleaning the center area
- Temperature control
- Cooler ON, compressor ON, FFU ON, ...
- IYC FFU glitch
- Re-start the FFU on work after 7th Oct.
- PEM Rack arrange
- There are discussion about DAQ of the KAGRA PEM channels. PEM channels may be assigned in the IX0 and IY0 racks.
- Less effect from other models(less data loss)
- Change the place of the IX0 and IY0 rack (next to MCF and BS chamber?)
plan : GoogleSpreadsheet
- There are discussion about DAQ of the KAGRA PEM channels. PEM channels may be assigned in the IX0 and IY0 racks.
- for O4 preparation
- We measured the potential difference for SRM and PR2 rack
- Need the investigation more
- We measured the potential difference for SRM and PR2 rack
water fluid (github207)
Discussion with Furuta-san & a company is started
- meeting with company persons (2) : 10/7 13:00~
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- PEM injection for O4
- Large speaker @ End station
- Magnetic injection by large coil
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
- Washimi
Aacoustic injection paper overleaf
- writing now (day by day)
- Fujikawa
- Lock loss study
- Kamioka visiting plan
- Kume
- ICA analysis related with PEM