Size: 6027
Comment:
|
Size: 5915
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020/10/02(Fri) 17:00- | * 2020/10/09(Fri) 17:30- |
Line 20: | Line 20: |
* Continued to 7th Oct. at maximum | * Continued to 12th Oct. at maximum |
Line 22: | Line 22: |
* ALS DARM | * DRMI lock |
Line 25: | Line 25: |
* Interferometer schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/G2012041/001/ChamberOpen-Schedule200925-2.pdf|JGW12041]] | * Interferometer schedule [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12041|JGW12041]] |
Line 44: | Line 44: |
* Some measurement if we can lock the DRFPMI * Acoustic injection with portable PEMs * Noise investigation |
* PEM measurement during blackout * Discussion in the report by Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12095|JGW-G2012095]] * Prepare the DAQ during blackout * Seismometer + magnetometer + Infrasound microphone + GND * Preparation : [[https://github.com/gw-pem/kagra-pem/issues/213|GitHub213]] * PEM DAQ racks * Use only IX and IY racks * Move the position of IX and IY racks |
Line 48: | Line 54: |
* PEM measurement during blackout * Discussion in the report by Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12095|JGW-G2012095]] * Prepare the DAQ during blackout * Seismometer + magnetometer + Infrasound microphone + GND * PEM DAQ racks * Use only IX and IY racks * Move the position of IX and IY racks |
* New PEMs toward O4 * Many microphone * Not only tables but also booth * Position of magnetometer * Position of seismometer * Additional PEMs to PSL room * 120Hz noise * glitch study |
Line 57: | Line 63: |
* New PEMs toward O4 * Many microphone * Not only tables but also booth * Position of magnetometer * Position of seismometer * Additional PEMs to PSL room * 120Hz noise * glitch study * Lock loss study * control loop of the ETMX MNR? * If you have new idea or discussion item, please write here |
* If you have new idea or discussion item, please write here |
Line 85: | Line 78: |
* Acoustic injection paper (Washimi) '''<<WRITING>>''' | * Acoustic injection paper (Washimi) '''<<1st DRAFT CIRCULATION>>''' |
Line 113: | Line 106: |
* meeting with company persons (2) : 10/7 13:00~ | * meeting with company persons : 10/7 13:00~ (DONE) |
Line 140: | Line 133: |
* FFU glitch discussion [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15137|klog15137]] | |
Line 144: | Line 136: |
* writing now (day by day) * Fujikawa * Lock loss study * Kamioka visiting plan |
* 1st draft circulation : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122]] * paper meeting : in the 4th week of October? |
Weekly PEM meeting
- 2020/10/09(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- Maybe online style for Japanese member
- (Next JPS meeting is also online-meeting)
General issue
- Interferometer status
- RSE lock trial
- Continued to 12th Oct. at maximum
- New suspension damping (modal damping)
- DRMI lock
- More stable DRMI operation than before.
- RSE lock trial
Interferometer schedule JGW12041
- - 12th Oct. RSE lock trial
- 5th Oct. - 19th Oct. Start the cleaning
- 15th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
- 14th Oct. blackout (13th, 15th working date for blackout)
- 19th Oct. - 23rd Oct. Clean work by company
- 22nd Oct. - 25th Oct. break vacuum
- 26th Oct. - Open chambers
- Working style (COVID-19 related)
- Some collaborator came to Kamioka. Please contact to Yokozawa if you plan to go to Kamioka.
- KAKENHI proposal limit
- NAOJ : Oct. 8
- ICRR : Mostly end of Oct.(4th week deadline)
- JSPS : Nov. 5 16:30 JST (final limit)
Discussion item
- PEM measurement during blackout
Discussion in the report by Washimi JGW-G2012095
- Prepare the DAQ during blackout
- Seismometer + magnetometer + Infrasound microphone + GND
Preparation : GitHub213
- PEM DAQ racks
- Use only IX and IY racks
- Move the position of IX and IY racks
- New PEMs toward O4
- Many microphone
- Not only tables but also booth
- Position of magnetometer
- Position of seismometer
- Additional PEMs to PSL room
- 120Hz noise
- glitch study
- Many microphone
- If you have new idea or discussion item, please write here
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
- Environmental part
- Acoustic noise : Refer our PEM injection paper.
We can discuss whether we use the result of pre-O3 study for the noise budget paper.
- Seismic noise : summarise the actual seismic nois during O3GK? (who?)
OMC leg vibration : 12th - 16th Sep. ?
AC power lines : Coherence analysis is done (http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848, Washimi)
- Magnetic noise : skipped in this paper?
Newtonian : seismic newtonian -> from PTEP1 (or Francisca?) / water fluid newtonian -> skipped / air density -> skipped
- Acoustic noise : Refer our PEM injection paper.
- We will held a noise budget meeting to summarize the current status, before the starting of heavy mine work. Details will be announced by KYamamoto-san(ToyamaU) soon later.
- Environmental part
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<1st DRAFT CIRCULATION>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start investigation>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Cleaning the center area
- Temperature control
- Cooler ON, compressor ON, FFU ON, ...
- IYC FFU glitch
- Re-start the FFU on work after 7th Oct.
- PEM Rack arrange
- There are discussion about DAQ of the KAGRA PEM channels. PEM channels may be assigned in the IX0 and IY0 racks.
- Less effect from other models(less data loss)
- Change the place of the IX0 and IY0 rack (next to MCF and BS chamber?)
plan : GoogleSpreadsheet
- There are discussion about DAQ of the KAGRA PEM channels. PEM channels may be assigned in the IX0 and IY0 racks.
- for O4 preparation
- We measured the potential difference for SRM and PR2 rack
- Need the investigation more
- We measured the potential difference for SRM and PR2 rack
water fluid (github207)
Discussion with Furuta-san & a company is started
- meeting with company persons : 10/7 13:00~ (DONE)
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- PEM injection for O4
- Large speaker @ End station
- Magnetic injection by large coil
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
Preparation for blackout GitHub214
- Blasting at the atotsu area.
- Washimi
Aacoustic injection paper overleaf
1st draft circulation : JGW-P2012122
- paper meeting : in the 4th week of October?
- Kume
- ICA analysis related with PEM