Size: 5915
Comment:
|
← Revision 6 as of 2020-10-09 15:49:59 ⇥
Size: 3787
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Maybe online style for Japanese member | |
Line 34: | Line 33: |
* Working style (COVID-19 related) * Some collaborator came to Kamioka. Please contact to Yokozawa if you plan to go to Kamioka. * KAKENHI proposal limit * NAOJ : Oct. 8 * ICRR : Mostly end of Oct.(4th week deadline) * JSPS : Nov. 5 16:30 JST (final limit) |
|
Line 50: | Line 41: |
* PEM DAQ racks * Use only IX and IY racks * Move the position of IX and IY racks * New PEMs toward O4 * Many microphone * Not only tables but also booth * Position of magnetometer * Position of seismometer * Additional PEMs to PSL room * 120Hz noise * glitch study |
|
Line 68: | Line 46: |
* Environmental part * Acoustic noise : Refer our PEM injection paper. * We can discuss whether we use [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15103|the result of pre-O3 study]] for the noise budget paper. * Seismic noise : summarise the actual seismic nois during O3GK? (who?) * --(OMC leg vibration : 12th - 16th Sep. ?)-- * AC power lines : Coherence analysis is done ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848]], Washimi) * Magnetic noise : skipped in this paper? * Newtonian : seismic newtonian -> from PTEP1 (or Francisca?) / water fluid newtonian -> skipped / air density -> skipped *We will held a noise budget meeting to summarize the current status, before the starting of heavy mine work. Details will be announced by KYamamoto-san(ToyamaU) soon later. |
* Next week, Washimi-san and Yokozawa will discuss with writing team. After that I will summarize again |
Line 80: | Line 50: |
* Portable PEMs (Yokozawa+) '''<<Start investigation>>''' | * Portable PEMs (Yokozawa+) '''<<Start writing>>''' |
Line 89: | Line 59: |
* Temperature control * Cooler ON, compressor ON, FFU ON, ... * IYC FFU glitch * Re-start the FFU on work after 7th Oct. * PEM Rack arrange * There are discussion about DAQ of the KAGRA PEM channels. PEM channels may be assigned in the IX0 and IY0 racks. * Less effect from other models(less data loss) * Change the place of the IX0 and IY0 rack (next to MCF and BS chamber?) * plan : [[https://docs.google.com/spreadsheets/d/1OHBOrNFt_Fpre-T-oSCkupGevc976d8T2PI9TVS_6pI/edit?usp=sharing|GoogleSpreadsheet]] * for O4 preparation * [[KAGRA/Subgroups/PEM/GNDmeeting|GND issue]] * We measured the potential difference for SRM and PR2 rack * Need the investigation more * water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]]) * Discussion with Furuta-san & a company is started |
* water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]]) * Discussion with Furuta-san & a company is started |
Line 108: | Line 63: |
* Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?) | * Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?) |
Line 110: | Line 65: |
* PEM injection for O4 * Large speaker @ End station * Magnetic injection by large coil |
|
Line 133: | Line 85: |
* Suspension health check during drill work(Next week) |
Weekly PEM meeting
- 2020/10/09(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- (Next JPS meeting is also online-meeting)
General issue
- Interferometer status
- RSE lock trial
- Continued to 12th Oct. at maximum
- New suspension damping (modal damping)
- DRMI lock
- More stable DRMI operation than before.
- RSE lock trial
Interferometer schedule JGW12041
- - 12th Oct. RSE lock trial
- 5th Oct. - 19th Oct. Start the cleaning
- 15th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
- 14th Oct. blackout (13th, 15th working date for blackout)
- 19th Oct. - 23rd Oct. Clean work by company
- 22nd Oct. - 25th Oct. break vacuum
- 26th Oct. - Open chambers
Discussion item
- PEM measurement during blackout
Discussion in the report by Washimi JGW-G2012095
- Prepare the DAQ during blackout
- Seismometer + magnetometer + Infrasound microphone + GND
Preparation : GitHub213
- If you have new idea or discussion item, please write here
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
- Next week, Washimi-san and Yokozawa will discuss with writing team. After that I will summarize again
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<1st DRAFT CIRCULATION>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Cleaning the center area
water fluid (github207)
Discussion with Furuta-san & a company is started
- meeting with company persons : 10/7 13:00~ (DONE)
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
Preparation for blackout GitHub214
- Blasting at the atotsu area.
- Suspension health check during drill work(Next week)
- Washimi
Aacoustic injection paper overleaf
1st draft circulation : JGW-P2012122
- paper meeting : in the 4th week of October?
- Kume
- ICA analysis related with PEM