Size: 3787
Comment:
|
← Revision 3 as of 2020-10-15 16:15:32 ⇥
Size: 3213
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020/10/09(Fri) 17:30- | * 2020/10/16(Fri) 17:30- |
Line 12: | Line 12: |
Line 14: | Line 13: |
* [[http://www.icrr.u-tokyo.ac.jp/YMAP/event/conf2020/index.html|YMAP workshop 2020]] : online, 11/7,8 * registration limit 11/1 |
|
Line 19: | Line 20: |
* Continued to 12th Oct. at maximum * New suspension damping (modal damping) * DRMI lock * More stable DRMI operation than before. |
* Maybe no serious problem for locking the DRFPMI |
Line 35: | Line 33: |
* PEM measurement during blackout * Discussion in the report by Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12095|JGW-G2012095]] * Prepare the DAQ during blackout * Seismometer + magnetometer + Infrasound microphone + GND * Preparation : [[https://github.com/gw-pem/kagra-pem/issues/213|GitHub213]] |
* Start the investigation for measurement of the newtonian noise |
Line 46: | Line 40: |
* Next week, Washimi-san and Yokozawa will discuss with writing team. After that I will summarize again | * Results of the environmental noise in the PTEP02 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12129|JGWDoc12129]] |
Line 62: | Line 56: |
* read out of the lightning sensor ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]]) | * read out of the lightning sensor ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]]) |
Line 83: | Line 77: |
* Preparation for blackout [[https://github.com/gw-pem/kagra-pem/issues/214|GitHub214]] * Blasting at the atotsu area. * Suspension health check during drill work(Next week) |
* Result of the cleaning |
Line 88: | Line 80: |
* Aacoustic injection paper [[https://www.overleaf.com/project/5f51878b1e41b00001893ac7|overleaf]] * 1st draft circulation : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122]] * paper meeting : in the 4th week of October? |
* Acoustic injection paper * PEM measurement during blackout |
Weekly PEM meeting
- 2020/10/16(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- (Next JPS meeting is also online-meeting)
YMAP workshop 2020 : online, 11/7,8
- registration limit 11/1
General issue
- Interferometer status
- RSE lock trial
- Maybe no serious problem for locking the DRFPMI
- RSE lock trial
Interferometer schedule JGW12041
- - 12th Oct. RSE lock trial
- 5th Oct. - 19th Oct. Start the cleaning
- 15th Oct. - 21st Oct. Warming up cryogenic ducts(IX, IY, EY)
- 14th Oct. blackout (13th, 15th working date for blackout)
- 19th Oct. - 23rd Oct. Clean work by company
- 22nd Oct. - 25th Oct. break vacuum
- 26th Oct. - Open chambers
Discussion item
- Start the investigation for measurement of the newtonian noise
- If you have new idea or discussion item, please write here
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<1st DRAFT CIRCULATION>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Cleaning the center area
water fluid (github207)
Discussion with Furuta-san & a company is started
- meeting with company persons : 10/7 13:00~ (DONE)
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
- Result of the cleaning
- Washimi
- Acoustic injection paper
- PEM measurement during blackout
- Kume
- ICA analysis related with PEM