Size: 553
Comment:
|
← Revision 10 as of 2020-10-23 08:12:46 ⇥
Size: 1104
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) | * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)[[attachment:PEM_201023.pdf|pdf]] |
Line 9: | Line 9: |
* Acoustic injection paper(Washimi) * PEM measurement during blackout(Washimi) |
* Welcome Kamiel and external magnetometers (Kamiel) [[attachment:Externalmagnetometers_KAGRA.pdf|pdf]] * Overview paper(Yokozawa)[[https://arxiv.org/abs/2009.09305|arXiv2009.09305]] * Acoustic injection paper(Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122]] * PEM measurement during blackout(Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0121/G2012143/001/washimi_VK-PEMmeeting_2021023_PowerOutage.pdf|JGW-G2012143 (slide1)]] |
Line 15: | Line 17: |
* Water fluid (Washimi) * Infrasound (Washimi) |
* Water fluid, Infrasound (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0121/G2012143/001/washimi_VK-PEMmeeting_2021023_NN.pdf|JGW-G2012143 (slide2)]] |
Virgo-KAGRA PEM meeting
- 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)pdf
- the ongoing infrastructure mitigation works for AdV+ (Federico)
Welcome Kamiel and external magnetometers (Kamiel) pdf
Overview paper(Yokozawa)arXiv2009.09305
Acoustic injection paper(Washimi) JGW-P2012122
PEM measurement during blackout(Washimi) JGW-G2012143 (slide1)
- Project of the KAGRA newtonian noise measurements
- Theory
- Seismometer analysis(Francesca)
Water fluid, Infrasound (Washimi) JGW-G2012143 (slide2)
- TOBA(?)