Size: 554
Comment:
|
Size: 804
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* PEM measurement during blackout(Washimi) | * PEM measurement during blackout(Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0121/G2012143/001/washimi_VK-PEMmeeting_2021023_PowerOutage.pdf|JGW-G2012143 (slide1)]] |
Line 15: | Line 15: |
* Water fluid (Washimi+) | * Water fluid (Washimi+)[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0121/G2012143/001/washimi_VK-PEMmeeting_2021023_NN.pdf|JGW-G2012143 (slide2)]] |
Virgo-KAGRA PEM meeting
- 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- the ongoing infrastructure mitigation works for AdV+ (Federico)
- Acoustic injection paper(Washimi)
PEM measurement during blackout(Washimi) JGW-G2012143 (slide1)
- Project of the KAGRA newtonian noise measurements
- Theory
- Seismometer analysis(Francesca)
Water fluid (Washimi+)JGW-G2012143 (slide2)
- Infrasound (Washimi)
- TOBA(?)