Size: 910
Comment:
|
Size: 992
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* Overview paper(Yokozawa)[[|https://arxiv.org/abs/2009.09305|arXiv2009.09305]] |
Virgo-KAGRA PEM meeting
- 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- the ongoing infrastructure mitigation works for AdV+ (Federico)
Welcome Kamiel and external magnetometers (Kamiel) pdf
Overview paper(Yokozawa)[[|https://arxiv.org/abs/2009.09305|arXiv2009.09305]]
- Acoustic injection paper(Washimi)
PEM measurement during blackout(Washimi) JGW-G2012143 (slide1)
- Project of the KAGRA newtonian noise measurements
- Theory
- Seismometer analysis(Francesca)
Water fluid (Washimi+)JGW-G2012143 (slide2)
- Infrasound (Washimi)
- TOBA(?)