Line 73: Line 73:
    * Discussion with Furuta-san & a company is started     * Plan reported in the [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/ChiefMeeting/2020-11-09|Chief meeting]] : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12217|JGW-G2012217]]
    * Rental portable fluidmeter : 11/25~12/9

Weekly PEM meeting

After this meeting

  • Fujikawa meeting

Agenda

Conference issue

  • KIW7
    • The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
    • Abstract deadline : 20th Nov.
    • plenary sessions of "O3GK reports" (commissioning, calibration, PEM, detchar, etc), and "Toward O4" (instruments, designs, analysis, etc)
    • For thesis presentations: Please prepare your presentation as a poster in F2F (poster award will be held). Please contribute also as an oral talk in the parallel sessions in KIW7, if the contents are not confidential.
  • F2F meeting
  • (Next JPS meeting is also online-meeting) 

General issue

  • Interferometer status
    • DGS upgrade
      • Give up because of hardware part. Continuously discussion.
  • Interferometer schedule JGW12041

    • Open chambers
    • Please contact us if you will work inside the chamber(take pictures)
  • C20 offline calibration data was relesed
  • Author list for O3b was opened
  • Contribution to PEM for joining the author list
    • KAGRA Environmental study (Including (future) newtonian noise measurement)
    • Noise evaluation using PEMs (Including lock loss study)
    • Setting monitors (Cabling, making monitor, ondotory maintenance)
    • Others

Discussion item

  • Start the investigation for measurement of the newtonian noise
    • Requested to publish (at least 1 year) seismometer data summary from many directions...
    • Timeline for Francesca analysis
    • Water fluid issue
    • Simulation
    • TOBA
  • Spectram of the lightening

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>

    • Results of the environmental noise in the PTEP02 JGWDoc12129

  • PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>

  • Acoustic injection paper (Washimi) <<1st DRAFT CIRCULATION>> JGW-P2012122-v1

    • Latest meeting : 11/12 17:30~, up to §4
    • Next meeting : 11/19 17:30~
  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM tasks for O4 will be discussed after this meeting with SEO
    • GND issue
    • Cabling issue
    • Cleaning the center area
    • water fluid (github207)

    • read out of the lightning sensor (github182)

    • Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
      • if accepted
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
      • Rn : contact person -> Guillaume Pronostさん (ICRR, SK)

      • cosmic-ray : plastic scintillator?
      • gamma/neutron : 新学術地下宇宙
      • start from a geiger counter?
    • Newtonian noise
      • Accelerometer for wall
      • Relative temperature monitor
      • Many seismometers
      • Superconducting Gravimeter
      • TOBA

Progress report

  • Yokozawa
    • Preparing the materials for portable PEMs
    • Rack ground GND
  • Washimi
    • Lightening
  • Kume
    • ICA analysis related with PEM

Place for memo