Size: 4111
Comment:
|
Size: 4101
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020/11/27(Fri) 17:30- | * 2020/12/04(Fri) 17:30- |
Line 11: | Line 11: |
==== PEM table ==== * [[attachment:IMG_0173.jpg|pic]] |
|
Line 18: | Line 15: |
* Abstract deadline : 30th Nov. | |
Line 27: | Line 23: |
* Deadline 12/3 | * Submission was finished |
Line 34: | Line 30: |
* Open chambers | |
Line 37: | Line 32: |
* IYC experience | |
Line 64: | Line 60: |
* Acoustic injection paper (Washimi) '''<<1st DRAFT CIRCULATION>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122-v1]] | * Acoustic injection paper (Washimi) '''<<1st DRAFT modification>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122-v1]] |
Line 66: | Line 62: |
* Playground data is approved! | |
Line 67: | Line 64: |
* Seismic NN paper (with Virgo) '''<<DRAFT CIRCULATION>>''' * Playground data application is necessary * Fractal paper (with Virgo) '''<<DRAFT CIRCULATION>>''' * Playground data application is necessary (Yokozawa) |
|
Line 72: | Line 73: |
* PEM tasks for O4 will be discussed after this meeting with SEO | * PEM tasks |
Line 76: | Line 77: |
* PEM Desk @ IY0 [[https://photos.app.goo.gl/tSY6okZKAUttLir8A|photo]] | * PEM cabling plan * New cable rack |
Line 78: | Line 80: |
* Plan reported in the [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/ChiefMeeting/2020-11-09|Chief meeting]] : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12217|JGW-G2012217]] * Rental portable fluidmeter : 11/25~12/9 |
* One week measurement at Yend * Position dependence |
Line 81: | Line 83: |
* Discussion with Virgo * PEM table * k1ctr plan * DELL PC |
Weekly PEM meeting
- 2020/12/04(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
After this meeting
- Fujikawa meeting
Agenda
Conference issue
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- For students, oral presentation at KIW7 and poster presentation at F2F meeting (Really?)
- Presentation
Yokozawa (KIW:Plenary session PEM)
Washimi (KIW:Acoustic inj+sound reverberation time+NN)
Kume (KIW:ICA analysis)
- Fujikawa (KIW+F2F:Lock loss study for thesis)
- JPS meeting
- Submission was finished
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMM upgrade
- IYC experience
- Please contact us if you will work inside the chamber(take pictures)
- Author list for O3b was opened
- Contribution to PEM for joining the author list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Discussion item
- Start the investigation for measurement of the newtonian noise
- Requested to publish (at least 1 year) seismometer data summary from many directions...
- Timeline for Francesca analysis
- Water fluid issue
- Simulation
- TOBA
- Spectram of the lightening
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<1st DRAFT modification>> JGW-P2012122-v1
- Latest meeting : 11/19 17:30~
- Playground data is approved!
- Now updating...
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary
Fractal paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary (Yokozawa)
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM tasks
- GND issue
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- New cable rack
water fluid (github207)
- One week measurement at Yend
- Position dependence
read out of the lightning sensor (github182)
- Discussion with Virgo
- PEM table
- k1ctr plan
- DELL PC
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- if accepted
- After O4
- RF monitor
- Tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- Newtonian noise
- Accelerometer for wall
- Relative temperature monitor
- Many seismometers
- Superconducting Gravimeter
- TOBA
Progress report
- Yokozawa
- Rack ground GND
- Washimi
- Water fluid
- Kume
- ICA analysis related with PEM