Differences between revisions 3 and 4
Revision 3 as of 2020-12-04 13:56:08
Size: 4101
Comment:
Revision 4 as of 2020-12-04 15:37:37
Size: 4233
Comment:
Deletions are marked like this. Additions are marked like this.
Line 52: Line 52:

 * Spectram of the lightening
 * We will have a NN meeting in the final week of this December.
Line 105: Line 104:
Line 110: Line 110:
  * Water fluid   * Water fluid [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12301|JGW-G2012301]]

Weekly PEM meeting

After this meeting

  • Fujikawa meeting

Agenda

Conference issue

  • KIW7
    • The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
    • For students, oral presentation at KIW7 and poster presentation at F2F meeting (Really?)
    • Presentation
      • Yokozawa (KIW:Plenary session PEM)

      • Washimi (KIW:Acoustic inj+sound reverberation time+NN)

      • Kume (KIW:ICA analysis)

      • Fujikawa (KIW+F2F:Lock loss study for thesis)
  • JPS meeting
    • Submission was finished
  • If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule JGW12041

    • VIS upgrade
    • IMM upgrade
    • IYC experience
    • Please contact us if you will work inside the chamber(take pictures)
  • Author list for O3b was opened
  • Contribution to PEM for joining the author list
    • KAGRA Environmental study (Including (future) newtonian noise measurement)
    • Noise evaluation using PEMs (Including lock loss study)
    • Setting monitors (Cabling, making monitor, ondotory maintenance)
    • Others

Discussion item

  • Start the investigation for measurement of the newtonian noise
    • Requested to publish (at least 1 year) seismometer data summary from many directions...
    • Timeline for Francesca analysis
    • Water fluid issue
    • Simulation
    • TOBA
  • We will have a NN meeting in the final week of this December.

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>

    • Results of the environmental noise in the PTEP02 JGWDoc12129

  • PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>

  • Acoustic injection paper (Washimi) <<1st DRAFT modification>> JGW-P2012122-v1

    • Latest meeting : 11/19 17:30~
    • Playground data is approved!
    • Now updating...
  • Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>

    • Playground data application is necessary
  • Fractal paper (with Virgo) <<DRAFT CIRCULATION>>

    • Playground data application is necessary (Yokozawa)
  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM tasks
    • GND issue
    • Cabling issue
    • Cleaning the center area
      • PEM cabling plan
      • New cable rack
    • water fluid (github207)

      • One week measurement at Yend
      • Position dependence
    • read out of the lightning sensor (github182)

      • Discussion with Virgo
    • PEM table
      • k1ctr plan
      • DELL PC
    • Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
      • if accepted
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
      • Rn : contact person -> Guillaume Pronostさん (ICRR, SK)

      • cosmic-ray : plastic scintillator?
      • gamma/neutron : 新学術地下宇宙
      • start from a geiger counter?
    • Newtonian noise
      • Accelerometer for wall
      • Relative temperature monitor
      • Many seismometers
      • Superconducting Gravimeter
      • TOBA

Progress report

  • Yokozawa
    • Rack ground GND
  • Washimi
  • Kume
    • ICA analysis related with PEM

Place for memo

KAGRA/Subgroups/PEM/Meeting/201204/Agenda (last edited 2020-12-04 17:27:05 by TakaakiYokozawa)