Differences between revisions 1 and 2
Revision 1 as of 2020-12-10 05:18:17
Size: 630
Comment:
Revision 2 as of 2020-12-18 06:34:29
Size: 638
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * the ongoing infrastructure mitigation works for AdV+ (Federico)  * the ongoing infrastructure mitigation works for AdV+ (Federico if have)

Virgo-KAGRA PEM meeting

Agenda

  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)

    • Statsu of PEM injection paper (Washimi)
  • the ongoing infrastructure mitigation works for AdV+ (Federico if have)
  • Investigation about lightening (Washimi, Kamiel)
    • (Again) Investigation of the spectrum
    • Provide the information from Blitzortung
  • Project of the KAGRA newtonian noise measurements
    • Theory
    • Seismometer analysis(Francesca)
    • Water fluid, Infrasound (Washimi)

KAGRA/Subgroups/PEM/Meeting/201218/Agenda (last edited 2020-12-18 17:55:52 by tatsuki.washimi)