Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2020-12-10 05:20:44
Size: 145
Comment:
Revision 6 as of 2020-12-22 09:25:13
Size: 700
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Water fluid + NN noise investigation meeting == == KAGRA Newtonian noise investigation meeting ==
Line 3: Line 3:
 * Special meeting  * Special meeting (Japanese)
Line 5: Line 5:

=== Agenda ===

 * Purpose of this meeting (Yokozawa)[[attachment:NN_Yokozawa_201222.pdf|pdf]]
 * Status of water NN simulation (Suzuki, Nishizawa, Somiya)
 * Status of KAGRA water fluid measurement (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12380|JGW-G2012380]]
 * Status of KAGRA seismic NN analysis (Yokozawa)
 * Status of infrasound NN investigation (Washimi)
 * Status of TOBA as GG monitor (Ando)
 * Discussion of future plan
    * FY2021 ICRR joint usage
    * O4
    * KAGRA+, ET

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya)
  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa)
  • Status of infrasound NN investigation (Washimi)
  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)