Differences between revisions 12 and 13
Revision 12 as of 2020-12-22 12:06:50
Size: 906
Comment:
Revision 13 as of 2021-01-15 07:17:51
Size: 935
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * Status of water NN simulation (Suzuki, Nishizawa, Somiya)  * Status of water NN simulation (Suzuki, Nishizawa, Somiya)[[attachment:Suzuki.pdf|pdf]]

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya)pdf

  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa) pdf

  • Status of infrasound NN investigation (Washimi) JGW-G2012383

  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET
  • Minutes

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)