Differences between revisions 14 and 15
Revision 14 as of 2021-01-15 07:18:38
Size: 936
Comment:
Revision 15 as of 2021-01-15 07:19:25
Size: 976
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
 [[attachment:enaofpdgojingnmg.png]]

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya) pdf

  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa) pdf

  • Status of infrasound NN investigation (Washimi) JGW-G2012383

  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET

    enaofpdgojingnmg.png

  • Minutes

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)