Differences between revisions 5 and 15 (spanning 10 versions)
Revision 5 as of 2020-12-22 07:50:31
Size: 641
Comment:
Revision 15 as of 2021-01-15 07:19:25
Size: 976
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * Status of water NN simulation (Suzuki, Nishizawa, Somiya)  * Status of water NN simulation (Suzuki, Nishizawa, Somiya) [[attachment:suzuki.pdf|pdf]]
Line 11: Line 11:
 * Status of KAGRA seismic NN analysis (Yokozawa)
 * Status of infrasound NN investigation (Washimi)
 * Status of KAGRA seismic NN analysis (Yokozawa) [[attachment:NN_Yokozawa_Virgo_201222.pdf|pdf]]
 * Status of infrasound NN investigation (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12383|JGW-G2012383]]
Line 15: Line 15:
    * FY2021 ICRR joint usage
    * O4
    * KAGRA+, ET

 [[attachment:enaofpdgojingnmg.png]]

 * [[KAGRA/Subgroups/PEM/Meeting/201222/Minutes|Minutes]]

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya) pdf

  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa) pdf

  • Status of infrasound NN investigation (Washimi) JGW-G2012383

  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET

    enaofpdgojingnmg.png

  • Minutes

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)