Differences between revisions 5 and 6
Revision 5 as of 2020-12-22 07:50:31
Size: 641
Comment:
Revision 6 as of 2020-12-22 09:25:13
Size: 700
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
    * FY2021 ICRR joint usage
    * O4
    * KAGRA+, ET

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya)
  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa)
  • Status of infrasound NN investigation (Washimi)
  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)