Line 12: Line 12:
 * Status of infrasound NN investigation (Washimi)  * Status of infrasound NN investigation (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12383|JGW-G2012383]]

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya)
  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa)
  • Status of infrasound NN investigation (Washimi) JGW-G2012383

  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET