Differences between revisions 7 and 8
Revision 7 as of 2020-12-22 09:26:47
Size: 797
Comment:
Revision 8 as of 2020-12-22 09:57:22
Size: 845
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * Status of KAGRA seismic NN analysis (Yokozawa)  * Status of KAGRA seismic NN analysis (Yokozawa) [[attachment:NN_Yokozawa_Virgo_201222.pdf|pdf]]

KAGRA Newtonian noise investigation meeting

Agenda

  • Purpose of this meeting (Yokozawa)pdf

  • Status of water NN simulation (Suzuki, Nishizawa, Somiya)
  • Status of KAGRA water fluid measurement (Washimi) JGW-G2012380

  • Status of KAGRA seismic NN analysis (Yokozawa) pdf

  • Status of infrasound NN investigation (Washimi) JGW-G2012383

  • Status of TOBA as GG monitor (Ando)
  • Discussion of future plan
    • FY2021 ICRR joint usage
    • O4
    • KAGRA+, ET

KAGRA/Subgroups/PEM/Meeting/201222 (last edited 2021-01-15 07:19:25 by TakaakiYokozawa)