Size: 845
Comment:
|
← Revision 15 as of 2021-01-15 07:19:25 ⇥
Size: 976
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* Status of water NN simulation (Suzuki, Nishizawa, Somiya) | * Status of water NN simulation (Suzuki, Nishizawa, Somiya) [[attachment:suzuki.pdf|pdf]] |
Line 18: | Line 18: |
[[attachment:enaofpdgojingnmg.png]] * [[KAGRA/Subgroups/PEM/Meeting/201222/Minutes|Minutes]] |
KAGRA Newtonian noise investigation meeting
- 2020/12/22(Tue) 10:00-12:00
- Special meeting (Japanese)
Zoom2 : https://zoom.us/j/6676627462
Agenda
Purpose of this meeting (Yokozawa)pdf
Status of water NN simulation (Suzuki, Nishizawa, Somiya) pdf
Status of KAGRA water fluid measurement (Washimi) JGW-G2012380
Status of KAGRA seismic NN analysis (Yokozawa) pdf
Status of infrasound NN investigation (Washimi) JGW-G2012383
- Status of TOBA as GG monitor (Ando)
- Discussion of future plan
- FY2021 ICRR joint usage
- O4
- KAGRA+, ET