Size: 4453
Comment:
|
Size: 4371
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020/12/11(Fri) 17:30- | * 2021/01/15(Fri) 17:30- |
Line 5: | Line 5: |
=== After this meeting === * 12/11 Regular meeting * After this meeting, we will have a practice of KIW7 by Fujikawa-san * 12/18 18:00 - 19:00 VK PEM meeting (After KIW7) * 12/22 10:00 - 12:00 Newtonian noise meeting (Prelininary) |
|
Line 16: | Line 10: |
*[[https://indico.phys.sinica.edu.tw/event/16/|KIW7]] * The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18) * For students, oral presentation at KIW7 and poster presentation at F2F meeting * Presentation * Yokozawa (KIW:Plenary session PEM) * Washimi (KIW:Acoustic inj+sound reverberation time+NN) * Kume (KIW:ICA analysis) * Fujikawa (KIW+F2F:Lock loss study for thesis) |
* JPS meeting [[https://www.jps.or.jp/activities/meetings/annual/annual-index.php|URL]] * オフライン解析によるKAGRAデータの雑音除去(Kume) |
Line 34: | Line 22: |
* AC noise at Xend * Please contact us if you will work inside the chamber(take pictures) |
* AC noise at IXV |
Line 37: | Line 24: |
* Author list for O3b was opened * [[https://dcc.ligo.org/M2000263-v1|DCC]] * Contribution to PEM for joining the author list |
* Contribution to PEM for joining the author list [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12435|Working list]] |
Line 46: | Line 30: |
* Evaluation meeting [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/ChiefMeeting/2021-01-12%20Evaluation%20Meeting|URL]] |
|
Line 49: | Line 35: |
* NN meeting ([[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/201222|URL]]) | |
Line 50: | Line 37: |
* Requested to publish (at least 1 year) seismometer data summary from many directions * Fractal analysis * Timeline for Francesca analysis * Many seismometers * Accelerometers for wall |
* Fractal analysis (Submitted to CPC) * Francesca analysis (Seismic(Completed), Atmospheric(data releasing)) * Many seismometers (Call analysis people) * Accelerometers for wall (Call analysis people) |
Line 56: | Line 42: |
* Fluid meter * Simulation |
* Fluid meter (We will install in this physical year ) * Simulation |
Line 65: | Line 51: |
* We will have a NN meeting in the final week of this December. | |
Line 71: | Line 56: |
* PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) '''<<Submitted>>''' * Acoustic injection paper (Washimi) '''<<2nd DRAFT CIRCULATION>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122-v1]] * posted to CPC (12/7), circulated on 12/9 [kagra 03888] * No comments yet |
* PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) '''<<Referee comment>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11664|JGW-P2011664]] * Acoustic injection paper (Washimi) '''<<Submitted to CQG>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12122|JGW-P2012122]] * Lightening paper (Washimi) '''<<Submitted to CPC>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12426|JGW-P2112426]] * Fractal paper (with Virgo) '''<<Submitted to CPC>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]] |
Line 76: | Line 61: |
* Playground data application is necessary * Fractal paper (with Virgo) '''<<DRAFT CIRCULATION>>''' * Playground data application is necessary (Yokozawa) |
|
Line 82: | Line 64: |
* Virgo O3 break paper '''<<PUBLISHED>>''' * [[https://www.mdpi.com/2075-4434/8/4/82]] |
|
Line 90: | Line 70: |
* DELL PC | * Cabling, DELL PC update |
Line 94: | Line 74: |
* BS-IYC cabling | |
Line 95: | Line 76: |
* cabling, moving from IX0 | |
Line 97: | Line 79: |
* IXV 40kHz glitch, moving mass? | |
Line 98: | Line 81: |
* IYC dry air, temperature is good now | |
Line 103: | Line 87: |
* Magnetometers for Schumann resonance [[https://www.metronix.de/metronixweb/fileadmin/user_upload/Dokumente/Geophysiks/Induction%20Coil%20MFS-06e/FlyerMFS-06e_jap_v35.pdf|MFS-06e]] | |
Line 120: | Line 105: |
* Water fluid [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12311|JGW-G2012311]] | * Water fluid * Lightening |
Weekly PEM meeting
- 2021/01/15(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
JPS meeting URL
- オフライン解析によるKAGRAデータの雑音除去(Kume)
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMM upgrade
- IYC experience
- Temperature control
- AC noise at IXV
Contribution to PEM for joining the author list Working list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Evaluation meeting URL
Discussion item
- Start the investigation for measurement of the newtonian noise
NN meeting (URL)
- Seismic NN
- Fractal analysis (Submitted to CPC)
- Francesca analysis (Seismic(Completed), Atmospheric(data releasing))
- Many seismometers (Call analysis people)
- Accelerometers for wall (Call analysis people)
- Water fluid NN
- Fluid meter (We will install in this physical year )
- Simulation
- Atomospheric NN
- Relative temperature monitor
- Infrasound
- Gravity monitor
- TOBA
- Superconducting Gravimeter
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Referee comment>> JGW-P2011664
Acoustic injection paper (Washimi) <<Submitted to CQG>> JGW-P2012122
Lightening paper (Washimi) <<Submitted to CPC>> JGW-P2112426
Fractal paper (with Virgo) <<Submitted to CPC>> JGW-P2112438
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM table
- k1ctr plan
- Cabling, DELL PC update
- k1ctr plan
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- BS-IYC cabling
- New cable rack
- cabling, moving from IX0
- Noise mitigation / Environment stability
- GND issue
- IXV 40kHz glitch, moving mass?
- Temperature control
- IYC dry air, temperature is good now
- GND issue
- PEM sensors
- Re-install the ACCs, MICs, MAGs until commissioning start
- water fluid monitor
- read out of the lightning sensor
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
Magnetometers for Schumann resonance MFS-06e
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
Progress report
- Yokozawa
- Rack ground GND
- Washimi
- Water fluid
- Lightening
- Kume
- ICA analysis related with PEM