=== After this meeting === * 12/11 Regular meeting * After this meeting, we will have a practice of KIW7 by Fujikawa-san * 12/18 18:00 - 19:00 VK PEM meeting (After KIW7) * 12/22 10:00 - 12:00 Newtonian noise meeting (Prelininary) |
|
Line 16: | Line 10: |
*[[https://indico.phys.sinica.edu.tw/event/16/|KIW7]] * The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18) * For students, oral presentation at KIW7 and poster presentation at F2F meeting * Presentation * Yokozawa (KIW:Plenary session PEM) * Washimi (KIW:Acoustic inj+sound reverberation time+NN) * Kume (KIW:ICA analysis) * Fujikawa (KIW+F2F:Lock loss study for thesis) |
* JPS meeting [[https://www.jps.or.jp/activities/meetings/annual/annual-index.php|URL]] * オフライン解析によるKAGRAデータの雑音除去(Kume) |
Line 34: | Line 22: |
* AC noise at Xend * Please contact us if you will work inside the chamber(take pictures) |
* AC noise at IXV |
Line 37: | Line 24: |
* Author list for O3b was opened * [[https://dcc.ligo.org/M2000263-v1|DCC]] * Contribution to PEM for joining the author list |
* Contribution to PEM for joining the author list [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12435|Working list]] |
Line 46: | Line 30: |
* Evaluation meeting [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/ChiefMeeting/2021-01-12%20Evaluation%20Meeting|URL]] |
|
Line 50: | Line 36: |
* Requested to publish (at least 1 year) seismometer data summary from many directions * Fractal analysis * Timeline for Francesca analysis * Many seismometers |
* Fractal analysis (Submitted to CPC) * Francesca analysis (Seismic(Completed), Atmospheric(data releasing)) * Many seismometers (Call analysis people) |
Weekly PEM meeting
- 2021/01/15(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
JPS meeting URL
- オフライン解析によるKAGRAデータの雑音除去(Kume)
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMM upgrade
- IYC experience
- Temperature control
- AC noise at IXV
Contribution to PEM for joining the author list Working list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Evaluation meeting URL
Discussion item
- Start the investigation for measurement of the newtonian noise
- Seismic NN
- Fractal analysis (Submitted to CPC)
- Francesca analysis (Seismic(Completed), Atmospheric(data releasing))
- Many seismometers (Call analysis people)
- Accelerometers for wall
- Water fluid NN
- Fluid meter
- Simulation
- Atomospheric NN
- Relative temperature monitor
- Infrasound
- Gravity monitor
- TOBA
- Superconducting Gravimeter
- Seismic NN
- We will have a NN meeting in the final week of this December.
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<2nd DRAFT CIRCULATION>> JGW-P2012122-v1
- posted to CPC (12/7), circulated on 12/9 [kagra 03888]
- No comments yet
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary
Fractal paper (with Virgo) <<DRAFT CIRCULATION>>
- Playground data application is necessary (Yokozawa)
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Virgo O3 break paper <<PUBLISHED>>
Preparation for O4
- PEM table
- k1ctr plan
- DELL PC
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- New cable rack
- Noise mitigation / Environment stability
- GND issue
- Temperature control
- PEM sensors
- Re-install the ACCs, MICs, MAGs until commissioning start
- water fluid monitor
- read out of the lightning sensor
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
Progress report
- Yokozawa
- Rack ground GND
- Washimi
Water fluid JGW-G2012311
- Kume
- ICA analysis related with PEM