Size: 4120
Comment:
|
Size: 4040
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 61: | Line 61: |
* Lightening paper (Washimi) | |
Line 62: | Line 63: |
* Playground data application is necessary * Fractal paper (with Virgo) '''<<DRAFT CIRCULATION>>''' * Playground data application is necessary (Yokozawa) |
* Fractal paper (with Virgo) '''<<Submit to CPC>>''' |
Weekly PEM meeting
- 2021/01/15(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
JPS meeting URL
- オフライン解析によるKAGRAデータの雑音除去(Kume)
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMM upgrade
- IYC experience
- Temperature control
- AC noise at IXV
Contribution to PEM for joining the author list Working list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study)
- Setting monitors (Cabling, making monitor, ondotory maintenance)
- Others
Evaluation meeting URL
Discussion item
- Start the investigation for measurement of the newtonian noise
NN meeting (URL)
- Seismic NN
- Fractal analysis (Submitted to CPC)
- Francesca analysis (Seismic(Completed), Atmospheric(data releasing))
- Many seismometers (Call analysis people)
- Accelerometers for wall (Call analysis people)
- Water fluid NN
- Fluid meter (We will install in this physical year )
- Simulation
- Atomospheric NN
- Relative temperature monitor
- Infrasound
- Gravity monitor
- TOBA
- Superconducting Gravimeter
- We will have a NN meeting in the final week of this December.
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
Results of the environmental noise in the PTEP02 JGWDoc12129
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted>>
Acoustic injection paper (Washimi) <<2nd DRAFT CIRCULATION>> JGW-P2012122-v1
- posted to CPC (12/7), circulated on 12/9 [kagra 03888]
- No comments yet
- Lightening paper (Washimi)
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
Fractal paper (with Virgo) <<Submit to CPC>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Virgo O3 break paper <<PUBLISHED>>
Preparation for O4
- PEM table
- k1ctr plan
- DELL PC
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- New cable rack
- Noise mitigation / Environment stability
- GND issue
- Temperature control
- PEM sensors
- Re-install the ACCs, MICs, MAGs until commissioning start
- water fluid monitor
- read out of the lightning sensor
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
Progress report
- Yokozawa
- Rack ground GND
- Washimi
Water fluid JGW-G2012311
- Kume
- ICA analysis related with PEM