Weekly PEM meeting

Agenda

Conference issue

  • JPS meeting URL

    • オフライン解析によるKAGRAデータの雑音除去(Kume)
  • If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule JGW12041

    • VIS upgrade
    • IMM upgrade
    • IYC experience
    • Temperature control
    • AC noise at IXV
  • Contribution to PEM for joining the author list Working list

    • KAGRA Environmental study (Including (future) newtonian noise measurement)
    • Noise evaluation using PEMs (Including lock loss study)
    • Setting monitors (Cabling, making monitor, ondotory maintenance)
    • Others
  • Evaluation meeting URL

Discussion item

  • Start the investigation for measurement of the newtonian noise
    • NN meeting (URL)

    • Seismic NN
      • Fractal analysis (Submitted to CPC)
      • Francesca analysis (Seismic(Completed), Atmospheric(data releasing))
      • Many seismometers (Call analysis people)
      • Accelerometers for wall (Call analysis people)
    • Water fluid NN
      • Fluid meter (We will install in this physical year )
      • Simulation
    • Atomospheric NN
      • Relative temperature monitor
      • Infrasound
    • Gravity monitor
      • TOBA
      • Superconducting Gravimeter

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>

    • Results of the environmental noise in the PTEP02 JGWDoc12129

  • PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Referee comment>> JGW-P2011664

  • Acoustic injection paper (Washimi) <<Submitted to CQG>> JGW-P2012122

  • Lightening paper (Washimi) <<Submitted to CPC>> JGW-P2112426

  • Fractal paper (with Virgo) <<Submitted to CPC>> JGW-P2112438

  • Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM table
    • k1ctr plan
      • Cabling, DELL PC update
  • Cabling issue
    • Cleaning the center area
    • PEM cabling plan
      • BS-IYC cabling
    • New cable rack
      • cabling, moving from IX0
  • Noise mitigation / Environment stability
    • GND issue
      • IXV 40kHz glitch, moving mass?
    • Temperature control
      • IYC dry air, temperature is good now
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs until commissioning start
    • water fluid monitor
    • read out of the lightning sensor
    • Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
    • Magnetometers for Schumann resonance MFS-06e

  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise

Progress report

  • Yokozawa
    • Rack ground GND
  • Washimi
    • Lightening paper
    • Thermography photo

  • Kume
    • ICA analysis related with PEM

Place for memo