Size: 5452
Comment:
|
Size: 5509
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 122: | Line 122: |
* Yokozawa and Nakano-san * Cable diagram for IOO |
Weekly PEM meeting
- 2021/01/29(Fri) 17:30-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
JPS meeting URL
- オフライン解析によるKAGRAデータの雑音除去(Kume)
- If you have some presentation about PEM related, please contact to me.
General issue
Interferometer schedule JGW12041
- VIS upgrade
- IMC beam centering
- IYC experience
- Temperature control
- New PC for weather station
- Oshino-san prepared
URL(only ICRR network)
- Call candidate for seismometer data analysis person
- Seismic motion during O3GK
- Turn over Fujikawa-san's analysis
- Detail analysis for micro-seismic motion
- Earthquake information
- Some human activity(1-10 Hz) behavior
- About 3monto for postdoc or doctor student, half year for master(2nd) student?
Contribution to PEM for joining the author list Working list
- KAGRA Environmental study (Including (future) newtonian noise measurement)
- Noise evaluation using PEMs (Including lock loss study and offline subtraction)
- Setting monitors (Cabling, making monitor, ondotori maintenance)
- Others
Evaluation meeting URL
- Make brief summary
Discussion item
- Start the investigation for measurement of the newtonian noise
NN meeting (URL)
- Seismic NN
- Fractal analysis (Submitted to CPC, seminar done)
- Francesca analysis (Seismic(Completed), Atmospheric(analysis done))
- Many seismometers (Call analysis people, hint from fractal analysis)
- Accelerometers for wall (Call analysis people)
- Water fluid NN
- Fluid meter (We will install in this physical year)
- Simulation
- Atomospheric NN
- Relative temperature monitor
- Infrasound (Four low-frequency microphone by Yokoyama-san)
- Gravity monitor
- TOBA
- Superconducting Gravimeter
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis is ongoing>>
- Remaining works:
- NB figure was completed
- Writing?
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<3rd Submitted done>> JGW-P2011664
Acoustic injection paper (Washimi) <<Submitted to CQG>> JGW-P2012122
Lightening paper (Washimi) <<Submitted to CPC>> JGW-P2112426
Fractal paper (with Virgo) <<Submitted to CPC>> JGW-P2112438
Seismic NN paper (with Virgo) <<DRAFT CIRCULATION>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM table
- k1ctr plan
- Cabling, DELL PC update
- k1ctr plan
- Cabling issue
- Cleaning the center area
- PEM cabling plan
- BS-IYC cabling (March or April?)
- New cable rack
- cabling, moving from IX0
- Noise mitigation / Environment stability
- GND issue
- IXV 40kHz glitch, moving mass?
- Yokozawa started the summary and plan for presentation at chief meeting
- Temperature control
- IYC dry air, temperature is good now
- GND issue
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
- read out of the lightning sensor
- Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
Magnetometers for Schumann resonance MFS-06e
- Infrasound microphone (ACO4152NHA, 0.05 - 8000 Hz)
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
Memo for working list in this physical year
- Find time when Yokozawa and Washimi-san can work
- Bird watching
- Change battery operation to AC power supply operation (We bought 20 AC taps)
- Measurement by particle counter
- Plan is ongoing
- Bird watching
- Yokozawa and Nakano-san
- Cable diagram for IOO
Progress report
- Yokozawa
- Temperature control
- Washimi
- Lightening paper
- Kume
- ICA analysis related with PEM