Line 33: Line 33:
  * InputX suspension commissioning
Line 34: Line 35:
 * KAGRA Author list
  * Please submit the form from [https://gwcenter.icrr.u-tokyo.ac.jp/co-author-appli|url]
  * Please contact to me if you cannot decide the effort
  * Please submit your contribution even if you will graduate this year
 * Sudden blackout occurred at 4th Mar.
  * Mostly recovered(DGS, vacuum and so on)
  * Need the check of circuit, PD, PEM(?) and so on

Weekly PEM meeting

Agenda

Conference issue

  • JPS meeting URL

    • オフライン解析によるKAGRAデータの雑音除去(Kume)
  • 「第七回極低放射能技術」研究会 URL

    • 落雷磁場を利用した神岡地下水分量の長期観測(鷲見, 3/25)
  • Future conferences
    • LVK meetin (online), March 15-19
    • GWADW (online), May 17-21, 2021
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
    • IMC-IMM commissioning (From Next week?)
      • Suspension commissioning and interferometer commissioning
      • Type-C suspension commissioning
      • Noise budget
      • Trial of vibration transfer function
    • IYC experience (completed)
    • InputX suspension commissioning
  • Sudden blackout occurred at 4th Mar.
    • Mostly recovered(DGS, vacuum and so on)
    • Need the check of circuit, PD, PEM(?) and so on
  • Evaluation meeting URL

    • Need more time for interferometer evaluation
      • Coupling with environmental noise
      • Eigen frequencies
      • Seismic, water flow
    • About noise budget (PEM???)
      • Take care for interferometer configuration, calibration
      • Pick up information
      • Overplotting
    • PEM circuits
      • Reducing orignal circuits
    • PEM cabling
      • Now considering the new cable diagram

Discussion item

  • Start the investigation for measurement of the newtonian noise : NN meeting (URL)

    • Portable water fluid monitor
    • Permanent water fluid monitor at Yend
      • March 8-12
  • Start the discussion about KAGRA seismic motion (URL)

    • Share the information and discussion using the timeseries and spectrum plots
    • Interesting measurement
    • Tilt meter (Do not need because underground experiment?)
  • Magnetic field
    • TBD
  • Discussion for particle counters JGW-G2112501

    • ISO class1 measurable particle counter at the entrance of PSL room
      • Before measurement, we need to measure with other particle counter
    • Effect of KOACH filter
    • Floor measurement
    • Discussion 1/29 memo

  • Contribution to PEM for joining the author list Working list

    • KAGRA Environmental study (Including (future) newtonian noise measurement)
    • Noise evaluation using PEMs (Including lock loss study and offline subtraction)
    • Setting monitors (Cabling, making monitor, ondotori maintenance)
    • Others

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Published>> JGW-P2011664

  • Acoustic injection paper (Washimi) <<1ts iteration>> JGW-P2012122

    • dead line : Mar. 9
  • Lightening paper (Washimi) <<Submitted to CPC>> JGW-P2112426, JGW-G2112504

    • playground data application.
  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Seismic NN paper (Fransisca) <<DRAFT CIRCULATION>>

    • Microphone data -> confirmed

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • Cabling issue
    • Cleaning the center area
      • Cable diagram for IOO, ALS, ISC were done by M.Nakano
      • GND investigation for electric rack was done by T.Yokozawa
      • Combination of two progress
  • PEM cabling plan
    • BS-IYC cable rack (March or April?)
    • New cable diagram
      • How many ADCs will be prepared? Whitening chassis?
      • Set the electric boxes for portable/permanent PEMs
  • Noise mitigation / Environment stability
    • Temperature control
      • IYC dry air, temperature is good now
      • After finishing the IYC experiment, temperature decreased
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
      • Some temporal PEMs for IMC-IMM commissioning (Using ADC in IOO1 rack?)
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Connector
      • Position
      • Measurement plan
      • Self noise evaluation
    • Infrasound monitor @ Atotsu, Mozumi, tunnel (+ Toyama?)
    • Infrasound microphone (ACO4152NHA, 0.05 - 8000 Hz)
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

Place for memo

KAGRA/Subgroups/PEM/Meeting/210305/Agenda (last edited 2021-03-05 16:58:01 by tatsuki.washimi)