Size: 1111
Comment:
|
Size: 1064
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Overview of CAL,DET,PEM,GIF (Yokozawa et.al.) [[https://arxiv.org/abs/2009.09305|arXiv:2009.09305]]: Accepted by PTEP * KAGRA Acoustic injection (Washimi et.al) [[https://arxiv.org/abs/2012.09294|arXiv:2012.09294]] : 1st referee comments * KAGRA Lightening paper (Washimi et.al) : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12426|JGW-P2112426]] under the KAGRA internal review * KAGRA NN evaluation paper (Fransisca et.al.) : Under authors circulation |
* Overview of CAL,DET,PEM,GIF (Yokozawa et.al.) [[https://doi.org/10.1093/ptep/ptab018]] : Published in PTEP * KAGRA Acoustic injection (Washimi et.al) [[https://arxiv.org/abs/2012.09294|arXiv:2012.09294]] : Answered to 1st referee comments * KAGRA Lightening paper (Washimi et.al) : [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516]] : Submitted to JINST * KAGRA NN evaluation paper (Fransisca et.al.) : Seminor on 2021/03/30(Tue) 17:00-(JST), 9:00-(CET) |
Line 18: | Line 18: |
* New magnetometers in KAGRA(Yokozawa) * Four magnetometers (MFS-06e) |
* New magnetometers in KAGRA : Four MFS-06e (Yokozawa) |
Virgo-KAGRA PEM meeting
- 2021-03-26(Fri) 17:00-18:00(JST) 9:00-10:00(CET)
Zoom2 : https://zoom.us/j/6676627462
Agenda
- Journal paper
Overview of CAL,DET,PEM,GIF (Yokozawa et.al.) https://doi.org/10.1093/ptep/ptab018 : Published in PTEP
KAGRA Acoustic injection (Washimi et.al) arXiv:2012.09294 : Answered to 1st referee comments
KAGRA Lightening paper (Washimi et.al) : arXiv:2103.06516 : Submitted to JINST
- KAGRA NN evaluation paper (Fransisca et.al.) : Seminor on 2021/03/30(Tue) 17:00-(JST), 9:00-(CET)
- KAGRA seismometer analysis paper (Alessandro et.al.) : submitted to Pure and Applied Geophysics
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- Infrasound measurement(Yokozawa)
- New magnetometers in KAGRA : Four MFS-06e (Yokozawa)
- Arrived at Kamioka 17th Mar.
- First measurements 31st Mar. with company people (and ADU-07e)
- Water fluid issue(Washimi)