Weekly PEM meeting

Agenda

Conference issue

  • 「第七回極低放射能技術」研究会 URL

    • 落雷磁場を利用した神岡地下水分量の長期観測(鷲見, 3/25)
  • Future conferences
    • GWADW (online), May 17-21, 2021
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Regular PEM meeting time
    • New physical year started.
    • 17:00 - Fri ??
  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX LVDT ACC installation
      • EX released
      • New Type-A optical lever
    • IOO commissioning
      • PMC recovery
      • Suspension commissioning and interferometer commissioning
      • Type-C suspension commissioning
        • Oplev recovery, characterization and calibration
      • Noise budget
      • Trial of vibration transfer function

Discussion item

  • Magnetic field
    • Preliminary results will be reported by Washimi-san
    • First data taking with GERD 3/31, 4/1
    • Various position measurement
  • Infrasound microphone
    • Preliminary results will be reported by Yokozawa
    • Various position measurement

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Acoustic injection paper (Washimi) <<2nd submission>> arXiv:2012.09294

    • modified version was submitted (3/5)
    • Some formalities (copy right, etc.) are finished.
    • Now we are waiting the reply from referees.
  • Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516

    • the English modification service has been finished.
  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • Global Cabling issue
    • Cleaning the center area
    • Ask company (Candidate SK service)
  • PEM cabling plan
    • BS-IYC cable rack (April)
    • New cable diagram
      • Current version will be reported by Yokozawa
    • IMC PEM rack will be ready
      • IO chassis and electronics -> ready

      • Fiber for data -> ready

      • Timing system -> planned

  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Connector
      • Position
      • Measurement plan
      • Self noise evaluation
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Yokozawa
    • Cabling plan
    • Infrasound microphone
  • Washimi
    • Water fluid monitor
    • Magnetic field
  • Kume
    • ICA analysis related with PEM
  • Pil-Jong
  • Water simulation

Place for memo