Weekly PEM meeting
- 2021/04/02(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
「第七回極低放射能技術」研究会 URL
- 落雷磁場を利用した神岡地下水分量の長期観測(鷲見, 3/25)
- Future conferences
- GWADW (online), May 17-21, 2021
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Regular PEM meeting time
- New physical year started.
- 17:00 - Fri ??
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX LVDT ACC installation
- EX released
- New Type-A optical lever
- IOO commissioning
- PMC recovery
- Suspension commissioning and interferometer commissioning
- Type-C suspension commissioning
- Oplev recovery, characterization and calibration
- Noise budget
- Trial of vibration transfer function
- VIS upgrade (ongoing)
Discussion item
- Magnetic field
- Preliminary results will be reported by Washimi-san
- First data taking with GERD 3/31, 4/1
- Various position measurement
- Infrasound microphone
- Preliminary results will be reported by Yokozawa
- Various position measurement
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Acoustic injection paper (Washimi) <<2nd submission>> arXiv:2012.09294
- modified version was submitted (3/5)
- Some formalities (copy right, etc.) are finished.
- Now we are waiting the reply from referees.
Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516
- the English modification service has been finished.
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- Global Cabling issue
- Cleaning the center area
- Ask company (Candidate SK service)
- PEM cabling plan
- BS-IYC cable rack (April)
- New cable diagram
- Current version will be reported by Yokozawa
- IMC PEM rack will be ready
IO chassis and electronics -> ready
Fiber for data -> ready
Timing system -> planned
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Connector
- Position
- Measurement plan
- Self noise evaluation
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Yokozawa
Cabling planpdf
Infrasound microphone JGWDco12748
- Washimi
- Water fluid monitor
Magnetic field JGW-G2112749
- Kume
- ICA analysis related with PEM
- Pil-Jong
O3GK DetChar result discussion
- Water simulation