Size: 766
Comment:
|
← Revision 9 as of 2021-04-23 17:01:03 ⇥
Size: 4400
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Virgo-KAGRA PEM meeting == * 2021-04-23(Fri) 17:00-18:00(JST) 9:00-10:00(CET) |
== Weekly PEM meeting == * 2021/04/23(Fri) 17:00- * Regular meeting |
Line 7: | Line 8: |
* Journal paper * KAGRA Acoustic injection (Washimi et.al) [[https://arxiv.org/abs/2012.09294|arXiv:2012.09294]] : Accepted by CQG * KAGRA Lightening paper (Washimi et.al) : [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516]] : Submitted to JINST * KAGRA NN evaluation paper (Fransisca et.al.) : To submit * KAGRA seismometer analysis paper (Alessandro et.al.) : submitted to Pure and Applied Geophysics |
==== Conference issue ==== |
Line 13: | Line 10: |
* KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) | * GWADW (online), May 17-21, 2021 * Registration deadline May 10 * Rapid registration is recommended * 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university) * Washimi (& Yokoyama-san) have talk(s) * Future conferences * 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 * GWPAW Hannover, Germany, Dec 14th-17th, 2021 |
Line 15: | Line 20: |
* Schumann noise evaluation (Washimi) | If you have some presentation about PEM related, please contact to me. |
Line 17: | Line 22: |
* Water fluid issue (Washimi) | ==== General issue ==== |
Line 19: | Line 24: |
* Infrasound measurement (Yokozawa) | * Interferometer schedule * VIS upgrade (ongoing) * EYC dirty check * IX LVDT ACC installation * Type-A height check * Type-A oplev characterization * PRs checks(Tighten the jigs) * IO commissioning * Optics characterization * Alignment done * Acceptance check yesterday * Type-C suspension commissioning * Oplev recovery, characterization and calibration * Transfer function check * MCo transfer function anomaly * PMC calibration * Noise budget by PEMs * Sound check * Schedule * [[https://dac.icrr.u-tokyo.ac.jp/attachment/6069bec9f130890061c6136a|figure]] * PEM schedule * [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt|url]] * Magnetic field(Done) * Re-installation of PEMs toward O4 ==== Jurnal paper issue ==== [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] * PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) [[https://docs.google.com/spreadsheets/d/1Lz5RNxdjOhdZp6CBef-USUUPmyNTrhww9a7u39W7PSI/edit?usp=sharing|Check list]], [[https://gokagra.slack.com/archives/C015M111B5G|slack]] '''<<Writing>>''' * NB plot has been finalised * PWT is writing the draft for each part * Lightening paper (Washimi) '''<<Opened in arXiv>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]] * the English modification service has been finished. * Fractal paper (Alessandro) '''<<Submitted to Journal>>''' [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12438|JGW-P2112438]], [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/Seminar/210128|seminor slide]] * Newtonian noise paper (Francesca) '''<<Submitted>>''' * Reverberation time paper (Washimi+) '''<<Start writing>>''' * ICA for E-run/O3GK (Kume, Yokoyama) '''<<Analysis ON GOING>>''' * Portable PEMs (Yokozawa+) '''<<Start writing>>''' ==== Preparation for O4 ==== * PEM cabling plan * Electric box position * BS-IYC cable rack (After golden week) * New cable diagram * Discussed today * Cleaning around IY rack cables(Done) * MCF rack ready * Cabling schedule * Discussed today * PEM sensors * Re-install the ACCs, MICs, MAGs before commissioning start * water fluid monitor * Magnetometers for Schumann resonance [[https://www.metronix.de/metronixweb/fileadmin/user_upload/Dokumente/Geophysiks/Induction%20Coil%20MFS-06e/FlyerMFS-06e_jap_v35.pdf|MFS-06e]] * Develop the satellite box * Vibration projection * Before closing the IMC chambers, IMC vacuum tables * Discussion with CAL team about A chamber * PEM injection * Acoustic injection at X/Y-end * Magnetic injection * After O4 * RF monitor * Tiltmeter * RI detector * Newtonian noise * Discussion with DET members * Daily summary page PEM * Line identification * Yokozawa * VIS -> IOO -> MIF ==== Progress report ==== * Investigation of ICA analysis * Some practice using PMC(?) * Progress * Yokozawa [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12840|JGW-12840]] * Cabling plan * Infrasound microphone * Washimi * Magnetic field * Water fluid monitor * Pil-Jong * Discussion of O3GK DET * Suzuki * Water simulation * Yuzurihara * Instrumental noise of sensor measure * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16554|measurement@2021/04/23]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12841|log note]] * Seismic motion analysis * O3GK * Microseismic * Long term ==== Place for memo ==== |
Weekly PEM meeting
- 2021/04/23(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- GWADW (online), May 17-21, 2021
- Registration deadline May 10
- Rapid registration is recommended
- Registration deadline May 10
- 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
Washimi (& Yokoyama-san) have talk(s)
- Future conferences
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX LVDT ACC installation
- Type-A height check
- Type-A oplev characterization
- PRs checks(Tighten the jigs)
- IO commissioning
- Optics characterization
- Alignment done
- Acceptance check yesterday
- Type-C suspension commissioning
- Oplev recovery, characterization and calibration
- Transfer function check
- MCo transfer function anomaly
- PMC calibration
- Noise budget by PEMs
- Sound check
- Optics characterization
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Magnetic field(Done)
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516
- the English modification service has been finished.
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submitted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling plan
- Electric box position
- BS-IYC cable rack (After golden week)
- New cable diagram
- Discussed today
- Cleaning around IY rack cables(Done)
- MCF rack ready
- Cabling schedule
- Discussed today
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Investigation of ICA analysis
- Some practice using PMC(?)
- Progress
Yokozawa JGW-12840
- Cabling plan
- Infrasound microphone
- Washimi
- Magnetic field
- Water fluid monitor
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Instrumental noise of sensor measure
- Seismic motion analysis
- O3GK
- Microseismic
- Long term