Size: 4456
Comment:
|
← Revision 9 as of 2021-04-23 17:01:03 ⇥
Size: 4400
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/04/16(Fri) 17:00- | * 2021/04/23(Fri) 17:00- |
Line 29: | Line 29: |
* PR checks(Tighten the jigs) * IOO commissioning * IMC alignment(done) |
* Type-A oplev characterization * PRs checks(Tighten the jigs) * IO commissioning * Optics characterization * Alignment done * Acceptance check yesterday |
Line 35: | Line 38: |
* Noise budget * Trial of vibration transfer function * PMC calibration * Noise budget by PEMs * SEO budget * If you need material, please let me know |
* MCo transfer function anomaly * PMC calibration * Noise budget by PEMs * Sound check |
Line 44: | Line 44: |
* Detail discussion in next Monday. | |
Line 58: | Line 57: |
* Acoustic injection paper (Washimi) '''<<Published>>''' [[https://doi.org/10.1088/1361-6382/abf89a]] | |
Line 65: | Line 63: |
* Newtonian noise paper (Francesca) '''<<Submit soon>>''' | * Newtonian noise paper (Francesca) '''<<Submitted>>''' |
Line 75: | Line 73: |
* Global Cabling issue * Cleaning the center area * Ask company (Candidate SK service) |
|
Line 80: | Line 74: |
* Electric box position | |
Line 85: | Line 80: |
* Cabling schedule will be finalize next week | * Cabling schedule * Discussed today |
Line 91: | Line 87: |
* Connector * Position * Measurement plan * Self noise evaluation |
* Develop the satellite box |
Line 119: | Line 112: |
* Task list and todo list * How to discuss? |
* Some practice using PMC(?) * Progress |
Line 122: | Line 115: |
* Yokozawa | * Yokozawa [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12840|JGW-12840]] |
Line 125: | Line 118: |
* PSL, PMC issue(With Yamamoto-san) | |
Line 128: | Line 120: |
* Magnetic field [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12777|JGW-G2112777]] | * Magnetic field |
Line 137: | Line 129: |
* Yuzurihara * Instrumental noise of sensor measure * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16554|measurement@2021/04/23]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12841|log note]] |
Weekly PEM meeting
- 2021/04/23(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- GWADW (online), May 17-21, 2021
- Registration deadline May 10
- Rapid registration is recommended
- Registration deadline May 10
- 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
Washimi (& Yokoyama-san) have talk(s)
- Future conferences
- 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- EYC dirty check
- IX LVDT ACC installation
- Type-A height check
- Type-A oplev characterization
- PRs checks(Tighten the jigs)
- IO commissioning
- Optics characterization
- Alignment done
- Acceptance check yesterday
- Type-C suspension commissioning
- Oplev recovery, characterization and calibration
- Transfer function check
- MCo transfer function anomaly
- PMC calibration
- Noise budget by PEMs
- Sound check
- Optics characterization
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Magnetic field(Done)
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<Opened in arXiv>> arXiv:2103.06516
- the English modification service has been finished.
Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submitted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling plan
- Electric box position
- BS-IYC cable rack (After golden week)
- New cable diagram
- Discussed today
- Cleaning around IY rack cables(Done)
- MCF rack ready
- Cabling schedule
- Discussed today
- PEM sensors
- Re-install the ACCs, MICs, MAGs before commissioning start
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Before closing the IMC chambers, IMC vacuum tables
- Discussion with CAL team about A chamber
- PEM injection
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Investigation of ICA analysis
- Some practice using PMC(?)
- Progress
Yokozawa JGW-12840
- Cabling plan
- Infrasound microphone
- Washimi
- Magnetic field
- Water fluid monitor
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Instrumental noise of sensor measure
- Seismic motion analysis
- O3GK
- Microseismic
- Long term