Weekly PEM meeting

Conference issue

  • GWADW (online), May 17-21, 2021
    • Registration deadline May 10
      • Rapid registration is recommended
  • 新学術「地下宇宙」領域研究会 (5/19~21, Kobe university)
    • Washimi (& Yokoyama-san) have talk(s)

  • Future conferences
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • EYC dirty check
      • IX LVDT ACC installation
      • Bp's finalize
    • IO commissioning
      • Optics characterization
        • IMC characterization
      • PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Lightening paper (Washimi) <<1st refree comments : finished>> arXiv:2103.06516

  • Fractal paper (Alessandro) <<Submitted to Journal>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Submitted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling plan
    • Electric box position (Done)
    • BS-IYC cable rack (Ongoing)
    • New cable diagram (Done)
    • Cleaning around IY rack cables(Done)
    • MCF rack ready (Mostly done)
  • PEM sensors
    • Re-install the ACCs, MICs, MAGs before commissioning start
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • Before closing the IMC chambers, IMC vacuum tables
    • Discussion with CAL team about A chamber
  • PEM injection
    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM
    • Line identification
      • Yokozawa
      • VIS -> IOO -> MIF

Progress report

  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Instrumental noise of sensor measure slide

    • PMC noise budget
  • Investigation of ICA analysis
    • Progress
  • Washimi
    • Magnet meters calibration : JGW-G2112913

    • Infrasound sensor test : klog16671

    • Water fluid monitor : No report
  • Yokozawa pdf

    • Cabling plan
    • Infrasound microphone
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term