⇤ ← Revision 1 as of 2021-06-25 07:35:13
4668
Comment:
|
4548
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/06/04(Fri) 17:00- | * 2021/06/25(Fri) 17:00- |
Line 10: | Line 10: |
* Remote style * Deadline 6/3 |
|
Line 16: | Line 14: |
* Poster abstract submission -> Extend to 15th June * If you have a plan of presentation, please let me know. |
* Washimi(poster), DET |
Line 32: | Line 29: |
* EYC dirty check | |
Line 34: | Line 30: |
* Green laser recovery(PLL) * IMM suspension check |
* Mostly ready for new oplevs * Green laser X arm * Reached green laser to xend * Prepare for x arm commissioning |
Line 38: | Line 37: |
* Initial alignment->beam reached to PR2 |
Weekly PEM meeting
- 2021/06/25(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- Future conferences
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IX Suspension commissioning
- Mostly ready for new oplevs
- Green laser X arm
- Reached green laser to xend
- Prepare for x arm commissioning
- IX Suspension commissioning
- IO commissioning
- IMC ASC
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Submitted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling plan
- Already done
- Electric box position
- BS-IYC cable rack
- New cable diagram
- Cleaning around IY rack cables
- MCF rack ready
- Cabling around MCF
- Progress
- Future
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- Already done
- PEM sensors
- Vibration projection
- PR2 pylon
- Oplev issue
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
- Line identification
- Yokozawa
VIS -> IOO -> MIF
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Microphone analysis
- Investigation of ICA analysis
- Kobayashi-san future plan
- Progress
- Washimi
ACO power, microphone, infrasound sensor test : JGW-G2112982
- Water fluid monitor : spectrum
- Water NN toy simulation by ROOT/C++ : for cross-check
- Yokozawa
Seismic motion IMCpdf
- Seismic motion analysis
- O3GK
- Microseismic
- Long term