Size: 4668
Comment:
|
Size: 4842
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/06/04(Fri) 17:00- | * 2021/06/25(Fri) 17:00- |
Line 8: | Line 8: |
* Future conferences * JPS meeting [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|url]] * Remote style * Deadline 6/3 * Yuzurihara(ICRR), Kobayashi(OCU) * 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 * Remote style * Poster abstract submission -> Extend to 15th June * If you have a plan of presentation, please let me know. |
* 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 [[http://kiw8.org/program/|program]] * Yuzurihara : 7/9 (Friday) 13:40-13:55 * Washimi : 7/7 (Wednesday) 17:00-17:30 (poster P5) * Piljong : 7/7 (Wednesday) 17:00-17:30 (poster P12) |
Line 21: | Line 15: |
* JPS meeting [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|url]] * Yuzurihara(ICRR), Kobayashi(OCU) * Washimi(NAOJ) in "Environmental physics session" |
|
Line 28: | Line 26: |
==== Business travel ==== * Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.) * Washimi (Kamioka) to Riken : 7/12,13 * Kobayashi (Oosaka) to Kamioka : 1~2 week(s) in July or August? * Suzuki (Tokyo) to Kamioka : some weeks in August? |
|
Line 32: | Line 37: |
* EYC dirty check | |
Line 34: | Line 38: |
* Green laser recovery(PLL) * IMM suspension check |
* Mostly ready for new oplevs * Green laser X arm * Reached green laser to xend * Prepare for x arm commissioning |
Line 38: | Line 45: |
* Initial alignment->beam reached to PR2 | |
Line 55: | Line 61: |
* Lightening paper (Washimi) '''<<Accepted>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]] | |
Line 58: | Line 64: |
* Newtonian noise paper (Francesca) '''<<Submitted>>''' | * Newtonian noise paper (Francesca) '''<<Reply to referee comment>>''' Mostly accepted |
Line 68: | Line 74: |
* PEM cabling plan * Already done * Electric box position * BS-IYC cable rack * New cable diagram * Cleaning around IY rack cables * MCF rack ready * Cabling around MCF * Progress * Set electric boxes(POP, BS, POS done)(OMC not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16936|klog16936]] * D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16907|klog16907]] |
* New k1ctr machine for PEM area * k1ctr26 is now avarable [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17242|klog17242]] * PEM cabling * IY0 rack model completed <- Seis & Mag channels are not yet * Remaining task * 15pin D-sub cabling * Box install for SR/OMC area * Seis for BS/OMC * Voltage monitor * IX, IY |
Line 85: | Line 91: |
* Current PEM installation * PSL partially done (Three ACC, one MIC, two portable MIC) * IMC booth, REFL booth done * Changed the PEM channel name[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16932|klog16932]] |
* Changed the PEM channel name |
Line 94: | Line 97: |
* PR2 pylon * Oplev issue |
* PR2 pylon(Done) |
Line 111: | Line 113: |
* Line identification * Yokozawa * VIS -> IOO -> MIF |
|
Line 122: | Line 121: |
* Nishizawa * Magnetic field analysis |
|
Line 124: | Line 126: |
* Microphone analysis | * Brief progress of microphone analysis * After this meeting, he will present detaily |
Line 127: | Line 130: |
* Kobayashi-san future plan | |
Line 131: | Line 133: |
* ACO power, microphone, infrasound sensor test : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12982|JGW-G2112982]] * Water fluid monitor : spectrum * Water NN toy simulation by ROOT/C++ : for cross-check |
* Infrasound sensor test : Try to monitor the Typhoon No.5 in this weekend. [[https://weathernews.jp/s/topics/202106/240055/|weather news]] * Water fluid monitor : No progress * Lightening sensor : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13039|JGW-G2113039]] |
Line 136: | Line 138: |
* Seismic motion IMC[[attachment: PEM_210604.pdf|pdf]] | * PR2 pylon and IMM chamber |
Weekly PEM meeting
- 2021/06/25(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 program
- Yuzurihara : 7/9 (Friday) 13:40-13:55
- Washimi : 7/7 (Wednesday) 17:00-17:30 (poster P5)
- Piljong : 7/7 (Wednesday) 17:00-17:30 (poster P12)
- 27th KAGRA Face-to-face meeting
- Remote style
JPS meeting url
- Yuzurihara(ICRR), Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
- Washimi (Kamioka) to Riken : 7/12,13
- Kobayashi (Oosaka) to Kamioka : 1~2 week(s) in July or August?
- Suzuki (Tokyo) to Kamioka : some weeks in August?
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IX Suspension commissioning
- Mostly ready for new oplevs
- Green laser X arm
- Reached green laser to xend
- Prepare for x arm commissioning
- IX Suspension commissioning
- IO commissioning
- IMC ASC
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<Accepted>> arXiv:2103.06516
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Reply to referee comment>> Mostly accepted
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New k1ctr machine for PEM area
k1ctr26 is now avarable klog17242
- PEM cabling
IY0 rack model completed <- Seis & Mag channels are not yet
- Remaining task
- 15pin D-sub cabling
- Box install for SR/OMC area
- Seis for BS/OMC
- Voltage monitor
- IX, IY
- Future
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- PR2 pylon(Done)
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Nishizawa
- Magnetic field analysis
- Yuzurihara
- Brief progress of microphone analysis
- After this meeting, he will present detaily
- Investigation of ICA analysis
- Progress
- Washimi
Infrasound sensor test : Try to monitor the Typhoon No.5 in this weekend. weather news
- Water fluid monitor : No progress
Lightening sensor : JGW-G2113039
- Yokozawa
- PR2 pylon and IMM chamber
- Seismic motion analysis
- O3GK
- Microseismic