Line 53: Line 53:
  * Lightening paper (Washimi) '''<<Accepted>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]]
Line 56: Line 56:
  * Newtonian noise paper (Francesca) '''<<Submitted>>'''   * Newtonian noise paper (Francesca) '''<<Mostly accepted>>'''
Line 66: Line 66:
  * PEM cabling plan
   * Already done
    * Electric box position
    * BS-IYC cable rack
    * New cable diagram
    * Cleaning around IY rack cables
    * MCF rack ready
    * Cabling around MCF
   * Progress
    * Set electric boxes(POP, BS, POS done)(OMC not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16936|klog16936]]
    * D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16907|klog16907]]
  * PEM cabling
   * IY rack model completed
   * Remaining task
    * 15pin D-sub cabling
    * IX, IY
    * Voltage monitor
Line 83: Line 78:
   * Current PEM installation
    * PSL partially done (Three ACC, one MIC, two portable MIC)
    * IMC booth, REFL booth done
   * Changed the PEM channel name[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16932|klog16932]]
   * Changed the PEM channel name
Line 92: Line 84:
   * PR2 pylon
   * Opl
ev issue
   * PR2 pylon(Done)
Line 109: Line 100:
  * Line identification
   * Yokozawa
   * VIS -> IOO -> MIF
Line 122: Line 110:
  * Microphone analysis   * Brief progress of microphone analysis
  * After this meeting, he will present detaily
Line 125: Line 114:
  * Kobayashi-san future plan
Line 129: Line 117:
  * ACO power, microphone, infrasound sensor test : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12982|JGW-G2112982]]
  * Water fluid monitor : spectrum
  * Water NN toy simulation by ROOT/C++ : for cross-check
  * ACO power, microphone, infrasound sensor test :
  * Water fluid monitor :
  * Lightening sensor
  * New k1ct
r machine
Line 134: Line 123:
  * Seismic motion IMC[[attachment: PEM_210604.pdf|pdf]]   * PR2 pylon and IMM chamber

Weekly PEM meeting

Conference issue

  • Future conferences
    • JPS meeting url

      • Yuzurihara(ICRR), Kobayashi(OCU)
    • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021
      • Remote style
      • Washimi(poster), DET
    • 27th KAGRA Face-to-face meeting
      • Remote style
    • Other meetings url

    • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • IX Suspension commissioning
        • Mostly ready for new oplevs
      • Green laser X arm
        • Reached green laser to xend
        • Prepare for x arm commissioning
    • IO commissioning
      • IMC ASC
      • IMC, PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Lightening paper (Washimi) <<Accepted>> arXiv:2103.06516

  • Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Mostly accepted>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • IY rack model completed
    • Remaining task
      • 15pin D-sub cabling
      • IX, IY
      • Voltage monitor
    • Future
      • BNC cabling
      • Booth MIC setting(IMC, REFL done)
      • Set calibration factor
  • PEM sensors
    • Changed the PEM channel name
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • PR2 pylon(Done)
    • Discussion with CAL team about A chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Yuzurihara
    • Brief progress of microphone analysis
    • After this meeting, he will present detaily
  • Investigation of ICA analysis
    • Progress
  • Washimi
    • ACO power, microphone, infrasound sensor test :
    • Water fluid monitor :
    • Lightening sensor
    • New k1ctr machine
  • Yokozawa
    • PR2 pylon and IMM chamber
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo