Size: 4548
Comment:
|
Size: 3946
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 53: | Line 53: |
* Lightening paper (Washimi) '''<<Accepted>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]] | |
Line 56: | Line 56: |
* Newtonian noise paper (Francesca) '''<<Submitted>>''' | * Newtonian noise paper (Francesca) '''<<Mostly accepted>>''' |
Line 66: | Line 66: |
* PEM cabling plan * Already done * Electric box position * BS-IYC cable rack * New cable diagram * Cleaning around IY rack cables * MCF rack ready * Cabling around MCF * Progress * Set electric boxes(POP, BS, POS done)(OMC not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16936|klog16936]] * D-sub cablings IY(POP, BS, POS done)(OMC not yet)(15pin not yet)[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16907|klog16907]] |
* PEM cabling * IY rack model completed * Remaining task * 15pin D-sub cabling * IX, IY * Voltage monitor |
Line 83: | Line 78: |
* Current PEM installation * PSL partially done (Three ACC, one MIC, two portable MIC) * IMC booth, REFL booth done * Changed the PEM channel name[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16932|klog16932]] |
* Changed the PEM channel name |
Line 92: | Line 84: |
* PR2 pylon * Oplev issue |
* PR2 pylon(Done) |
Line 109: | Line 100: |
* Line identification * Yokozawa * VIS -> IOO -> MIF |
|
Line 122: | Line 110: |
* Microphone analysis | * Brief progress of microphone analysis * After this meeting, he will present detaily |
Line 125: | Line 114: |
* Kobayashi-san future plan | |
Line 129: | Line 117: |
* ACO power, microphone, infrasound sensor test : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12982|JGW-G2112982]] * Water fluid monitor : spectrum * Water NN toy simulation by ROOT/C++ : for cross-check |
* ACO power, microphone, infrasound sensor test : * Water fluid monitor : * Lightening sensor * New k1ctr machine |
Line 134: | Line 123: |
* Seismic motion IMC[[attachment: PEM_210604.pdf|pdf]] | * PR2 pylon and IMM chamber |
Weekly PEM meeting
- 2021/06/25(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- Future conferences
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IX Suspension commissioning
- Mostly ready for new oplevs
- Green laser X arm
- Reached green laser to xend
- Prepare for x arm commissioning
- IX Suspension commissioning
- IO commissioning
- IMC ASC
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<Accepted>> arXiv:2103.06516
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Mostly accepted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
- IY rack model completed
- Remaining task
- 15pin D-sub cabling
- IX, IY
- Voltage monitor
- Future
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- PR2 pylon(Done)
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Brief progress of microphone analysis
- After this meeting, he will present detaily
- Investigation of ICA analysis
- Progress
- Washimi
- ACO power, microphone, infrasound sensor test :
- Water fluid monitor :
- Lightening sensor
- New k1ctr machine
- Yokozawa
- PR2 pylon and IMM chamber
- Seismic motion analysis
- O3GK
- Microseismic
- Long term