Weekly PEM meeting
- 2021/06/25(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- Future conferences
If you have some presentation about PEM related, please contact to me.
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IX Suspension commissioning
- Mostly ready for new oplevs
- Green laser X arm
- Reached green laser to xend
- Prepare for x arm commissioning
- IX Suspension commissioning
- IO commissioning
- IMC ASC
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Lightening paper (Washimi) <<Accepted>> arXiv:2103.06516
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Mostly accepted>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
- IY rack model completed
- Remaining task
- 15pin D-sub cabling
- IX, IY
- Voltage monitor
- Future
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- PR2 pylon(Done)
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Yuzurihara
- Brief progress of microphone analysis
- After this meeting, he will present detaily
- Investigation of ICA analysis
- Progress
- Washimi
- ACO power, microphone, infrasound sensor test :
- Water fluid monitor :
- Lightening sensor
- New k1ctr machine
- Yokozawa
- PR2 pylon and IMM chamber
- Seismic motion analysis
- O3GK
- Microseismic
- Long term