Differences between revisions 3 and 10 (spanning 7 versions)
Revision 3 as of 2021-07-02 08:07:18
Size: 5015
Comment:
Revision 10 as of 2021-07-02 17:16:20
Size: 4695
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
   * Yuzurihara(ICRR), Kobayashi(OCU)    * Yuzurihara(ICRR) : 14pW3-5
   *
Kobayashi(OCU)
Line 30: Line 31:
 * Kobayashi (Oosaka) to Kamioka : 1~2 week(s) in July or August?  * Kobayashi (Oosaka) to Kamioka : 7/13-21
Line 40: Line 41:
    * Trouble shooting
   * EX Suspension commissioning
    * Oplev installation ongoing
    * Mirror alignment
    * TF measurement
Line 62: Line 68:
  * Lightening paper (Washimi) '''<<Accepted>>''' [[https://arxiv.org/abs/2103.06516|arXiv:2103.06516 ]]
Line 65: Line 70:
  * Newtonian noise paper (Francesca) '''<<Reply to referee comment>>''' Mostly accepted   * Newtonian noise paper (Francesca) '''<<Reply to referee comment>>'''
Line 76: Line 81:
    * k1ctr26 is now avarable [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17242|klog17242]]     * k1ctr26 is now available
Line 80: Line 85:
   * 15pin cabling
   * Cable cleaning PSL room
Line 81: Line 88:
    * 15pin D-sub cabling
Line 86: Line 92:
   * Future
Line 98: Line 103:
   * PR2 pylon(Done)
Line 127: Line 131:
  * Brief progress of microphone analysis
  * After this meeting, he will present in detail [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13043|slide]]
  * Brief progress of microphone analysis [[attachment:yuzurihara_20210702_PEMv2.pdf|slide]]
Line 134: Line 137:
  * Infrasound sensor test : Try to monitor the Typhoon No.5 in this weekend. [[https://weathernews.jp/s/topics/202106/240055/|weather news]]
  * Water fluid monitor : No progress
  * Lightening sensor : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13039|JGW-G2113039]]
  * Infrasound sensor test : not yet
  * Lightening sensor : SEM update [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/slowmonitor/Lightning/]]
Line 139: Line 141:
  * PR2 pylon and IMM chamber
Line 148: Line 149:
 * Next meeting is 100 times meeting  * Next meeting is '''''100th anniversary meeting !!!'''''

Weekly PEM meeting

Conference issue

  • 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 program

    • Yuzurihara : 7/9 (Friday) 13:40-13:55
    • Piljong : 7/9 (Friday) 14:10-14:25
    • Washimi : 7/7 (Wednesday) 17:00-17:30 (poster P5)
    • Piljong : 7/7 (Wednesday) 17:00-17:30 (poster P12)
  • 27th KAGRA Face-to-face meeting
    • Remote style
  • JPS meeting url

    • Yuzurihara(ICRR) : 14pW3-5
    • Kobayashi(OCU)
    • Washimi(NAOJ) in "Environmental physics session"
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
  • Washimi (Kamioka) to Riken : 7/12,13
  • Kobayashi (Oosaka) to Kamioka : 7/13-21
  • Suzuki (Tokyo) to Kamioka : some weeks in August?

General issue

  • Interferometer schedule
    • VIS upgrade (ongoing)
      • IX Suspension commissioning
        • Mostly ready for new oplevs
        • Trouble shooting
      • EX Suspension commissioning
        • Oplev installation ongoing
        • Mirror alignment
        • TF measurement
      • Green laser X arm
        • Reached green laser to xend
        • Prepare for x arm commissioning
    • IO commissioning
      • IMC ASC
      • IMC, PMC calibration
        • Noise budget by PEMs
        • Sound check
  • Schedule
  • PEM schedule
    • url

    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Reply to referee comment>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • New k1ctr machine for PEM area
    • k1ctr26 is now available
  • PEM cabling
    • IY0 rack model completed <- Seis & Mag channels are not yet

    • 15pin cabling
    • Cable cleaning PSL room
    • Remaining task
      • Box install for SR/OMC area
      • Seis for BS/OMC
      • Voltage monitor
      • IX, IY
      • BNC cabling
      • Booth MIC setting(IMC, REFL done)
      • Set calibration factor
  • PEM sensors
    • Changed the PEM channel name
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • Discussion with CAL team about A chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Pil-Jong
    • Discussion of O3GK DET
  • Suzuki
    • Water simulation
  • Nishizawa
    • Magnetic field analysis
  • Yuzurihara
    • Brief progress of microphone analysis slide

  • Investigation of ICA analysis
    • Progress
  • Washimi
  • Yokozawa
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

  • Next meeting is 100th anniversary meeting !!!

KAGRA/Subgroups/PEM/Meeting/210702/Agenda (last edited 2021-07-02 17:16:20 by HirotakaYuzurihara)