Weekly PEM meeting
- 2021/07/02(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 program
- Yuzurihara : 7/9 (Friday) 13:40-13:55
- Piljong : 7/9 (Friday) 14:10-14:25
- Washimi : 7/7 (Wednesday) 17:00-17:30 (poster P5)
- Piljong : 7/7 (Wednesday) 17:00-17:30 (poster P12)
- 27th KAGRA Face-to-face meeting
- Remote style
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
- Washimi (Kamioka) to Riken : 7/12,13
- Kobayashi (Oosaka) to Kamioka : 7/13-21
- Suzuki (Tokyo) to Kamioka : some weeks in August?
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- IX Suspension commissioning
- Mostly ready for new oplevs
- Trouble shooting
- EX Suspension commissioning
- Oplev installation ongoing
- Mirror alignment
- TF measurement
- Green laser X arm
- Reached green laser to xend
- Prepare for x arm commissioning
- IX Suspension commissioning
- IO commissioning
- IMC ASC
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Reply to referee comment>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- New k1ctr machine for PEM area
- k1ctr26 is now available
- PEM cabling
IY0 rack model completed <- Seis & Mag channels are not yet
- 15pin cabling
- Cable cleaning PSL room
- Remaining task
- Box install for SR/OMC area
- Seis for BS/OMC
- Voltage monitor
- IX, IY
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Nishizawa
- Magnetic field analysis
- Yuzurihara
Brief progress of microphone analysis slide
- Investigation of ICA analysis
- Progress
- Washimi
- Infrasound sensor test : not yet
Lightening sensor : SEM update https://gwdet.icrr.u-tokyo.ac.jp/~controls/slowmonitor/Lightning/
- Yokozawa
- Seismic motion analysis
- O3GK
- Microseismic
- Long term
Place for memo
Next meeting is 100th anniversary meeting !!!