Size: 4695
Comment:
|
Size: 4642
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/07/02(Fri) 17:00- | * 2021/07/16(Fri) 17:00- |
Line 8: | Line 8: |
* 8th KIW (online), KASI, Daejeon, Korea, July 7-9, 2021 [[http://kiw8.org/program/|program]] * Yuzurihara : 7/9 (Friday) 13:40-13:55 * Piljong : 7/9 (Friday) 14:10-14:25 * Washimi : 7/7 (Wednesday) 17:00-17:30 (poster P5) * Piljong : 7/7 (Wednesday) 17:00-17:30 (poster P12) |
|
Line 16: | Line 10: |
* LVK meeting * [[https://indico.ijclab.in2p3.fr/event/7338/|url]] * 6,7,8,9,10 September |
|
Line 31: | Line 29: |
* Kobayashi (Oosaka) to Kamioka : 7/13-21 | * Kobayashi (OCU) to Kamioka : 7/13-21 |
Line 39: | Line 37: |
* IX Suspension commissioning * Mostly ready for new oplevs * Trouble shooting * EX Suspension commissioning * Oplev installation ongoing * Mirror alignment * TF measurement * Green laser X arm * Reached green laser to xend * Prepare for x arm commissioning |
* Trouble shooting * Green laser X arm * Reached green laser to xend * Find signal in TMSX * Prepare for x arm commissioning |
Line 52: | Line 45: |
* ALS | |
Line 55: | Line 49: |
* Initial alignment * Set oplev to good alignment point (PR2, PR3, ITMX, ETMX) |
|
Line 60: | Line 57: |
* [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt|url]] | |
Line 80: | Line 76: |
* New k1ctr machine for PEM area * k1ctr26 is now available |
|
Line 95: | Line 88: |
* End station PEM | |
Line 126: | Line 120: |
* Hoshino * Progress |
|
Line 131: | Line 128: |
* Brief progress of microphone analysis [[attachment:yuzurihara_20210702_PEMv2.pdf|slide]] |
* Microphone analysis * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12953|KIW slide]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17404|k-log : Investigation of PMC correlation with microphones when FFU turned off]] * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17426|k-log : investigation of PMC correlation in PSL room with observation mode]] |
Line 137: | Line 137: |
* Infrasound sensor test : not yet * Lightening sensor : SEM update [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/slowmonitor/Lightning/]] |
* Infrasound sensor test : no update * Lightening sensor : Riken shucchou * PSL room sound : [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17554]] |
Line 149: | Line 150: |
* Next meeting is '''''100th anniversary meeting !!!''''' | * This meeting is '''''100th anniversary meeting !!!''''' |
Weekly PEM meeting
- 2021/07/16(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- 27th KAGRA Face-to-face meeting
- Remote style
- LVK meeting
- 6,7,8,9,10 September
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
- Washimi (Kamioka) to Riken : 7/12,13
- Kobayashi (OCU) to Kamioka : 7/13-21
- Suzuki (Tokyo) to Kamioka : some weeks in August?
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- Trouble shooting
- Green laser X arm
- Reached green laser to xend
- Find signal in TMSX
- Prepare for x arm commissioning
- IO commissioning
- IMC ASC
- ALS
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- Initial alignment
- Set oplev to good alignment point (PR2, PR3, ITMX, ETMX)
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Reply to referee comment>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
IY0 rack model completed <- Seis & Mag channels are not yet
- 15pin cabling
- Cable cleaning PSL room
- Remaining task
- Box install for SR/OMC area
- Seis for BS/OMC
- Voltage monitor
- IX, IY
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- End station PEM
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Hoshino
- Progress
- Nishizawa
- Magnetic field analysis
- Yuzurihara
- Investigation of ICA analysis
- Progress
- Washimi
- Infrasound sensor test : no update
- Lightening sensor : Riken shucchou
PSL room sound : https://klog.icrr.u-tokyo.ac.jp/osl/?r=17554
- Yokozawa
- Seismic motion analysis
- O3GK
- Microseismic
- Long term
Place for memo
This meeting is 100th anniversary meeting !!!