Weekly PEM meeting
- 2021/07/16(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- 27th KAGRA Face-to-face meeting
- Remote style
- LVK meeting
- 6,7,8,9,10 September
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
- Washimi (Kamioka) to Riken : 7/12,13
- Kobayashi (OCU) to Kamioka : 7/13-21
- Suzuki (Tokyo) to Kamioka : 8/16-26
General issue
- Interferometer schedule
- VIS upgrade (ongoing)
- Trouble shooting
- Green laser X arm
- Reached green laser to xend
- Find signal in TMSX
- Prepare for x arm commissioning
- IO commissioning
- IMC ASC
- ALS
- IMC, PMC calibration
- Noise budget by PEMs
- Sound check
- Initial alignment
- Set oplev to good alignment point (PR2, PR3, ITMX, ETMX)
- VIS upgrade (ongoing)
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is writing the draft for each part
Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide
Newtonian noise paper (Francesca) <<Reply to referee comment>>
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
IY0 rack model completed <- Seis & Mag channels are not yet
- 15pin cabling
- Cable cleaning PSL room
- Remaining task
- Box install for SR/OMC area
- Seis for BS/OMC
- Voltage monitor
- IX, IY
- BNC cabling
- Booth MIC setting(IMC, REFL done)
- Set calibration factor
- End station PEM
- PEM sensors
- Changed the PEM channel name
- water fluid monitor
Magnetometers for Schumann resonance MFS-06e
- Develop the satellite box
- Vibration projection
- Discussion with CAL team about A chamber
- PEM injection
Low frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Pil-Jong
- Discussion of O3GK DET
- Suzuki
- Water simulation
- Hoshino
- Progress
- Nishizawa
- Magnetic field analysis
- Yuzurihara
- Investigation of ICA analysis
- Progress
- Washimi
- Infrasound sensor test : no update
- Lightening sensor : Riken shucchou
PSL room sound : https://klog.icrr.u-tokyo.ac.jp/osl/?r=17554
- Yokozawa
- Seismic motion analysis
- O3GK
- Microseismic
- Long term
Place for memo
This meeting is 100th anniversary meeting !!!