Line 9: Line 9:
   * 27-29, Aug.
Line 27: Line 28:
 * Ookawa, Hoshino (Niigata) to Kamioka : 7/3 (Sat.)
 * Washimi (Kamioka) to Riken : 7/12,13
 * Depending on the situation of COVID-19
Line 36: Line 36:
  * VIS upgrade (ongoing)
   * Trouble shooting
  * Green laser X arm
   * Reached green laser to xend
   * Find signal in TMSX
   * Prepare for x arm commissioning
  * Scheduling meeting next Monday(2nd Aug.)

  * Procedure toward X arm commissioning
   * [https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?query_id=10|url]
   * Pcal finalize->Oplev finalize->Suspension health check->Acceptance check
Line 46: Line 45:
   * IMC, PMC calibration
    * Noise budget by PEMs
    * Sound check
Line 52: Line 48:

  * Mid size baffle installation

Weekly PEM meeting

Conference issue

  • 27th KAGRA Face-to-face meeting
    • 27-29, Aug.
    • Remote style
  • LVK meeting
    • url

    • 6,7,8,9,10 September
  • JPS meeting url

    • Yuzurihara(ICRR) : 14pW3-5
    • Kobayashi(OCU)
    • Washimi(NAOJ) in "Environmental physics session"
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • Kobayashi (OCU) to Kamioka : 7/13-21
  • Suzuki (Tokyo) to Kamioka : 8/16-26

General issue

  • Interferometer schedule
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is writing the draft for each part
  • Fractal paper (Alessandro) <<Reply to referee comment>> JGW-P2112438, seminor slide

  • Newtonian noise paper (Francesca) <<Reply to referee comment>>

  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • IY0 rack model completed <- Seis & Mag channels are not yet

    • 15pin cabling
    • Cable cleaning PSL room
    • Remaining task
      • Box install for SR/OMC area
      • Seis for BS/OMC
      • Voltage monitor
      • IX, IY
      • BNC cabling
      • Booth MIC setting(IMC, REFL done)
      • Set calibration factor
      • End station PEM
  • PEM sensors
    • Changed the PEM channel name
    • water fluid monitor
    • Magnetometers for Schumann resonance MFS-06e

      • Develop the satellite box
  • Vibration projection
    • Discussion with CAL team about A chamber
  • PEM injection
    • Low frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

Place for memo

  • This meeting is 100th anniversary meeting !!!