Size: 4703
Comment:
|
Size: 3846
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/08/20(Fri) 17:00- | * 2021/09/03(Fri) 17:00- |
Line 8: | Line 8: |
* 27th KAGRA Face-to-face meeting * 27-29, Aug. [[https://forms.office.com/Pages/ResponsePage.aspx?id=3sqHADRb2kSC3zViN2lm-RYWzIGNRk5NqrajlD9DHD1UN1U1VE5DUEowUkhLMFIzNElWVUhVNFFTTy4u|Registration]], Remote style * Registration deadline : August 20 (Fri) 6:00PM JST. * If you have a plan to have a presentation or poster, please let me know. * PEM status and publication reports (Washimi) : oral * Water NN (Suzuki) : poster * ICA (Kobayashi) : poster * Schumann resonance (Washimi) : poster * Seismic motion (Yokozawa) : poster |
|
Line 21: | Line 11: |
* Washimi(poster) [[https://dcc.ligo.org/LIGO-G2101778|LIGO Document G2101778]] | |
Line 42: | Line 33: |
* [[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?query_id=10|url]] | |
Line 49: | Line 39: |
* Initial alignment * Set oplev to good alignment point (PR2, PR3, ITMX, ETMX) |
* IR alignment |
Line 53: | Line 42: |
* Y arm commissioning * Installed cryopayload to Yend cryostat |
|
Line 136: | Line 128: |
* Weather around Obon : [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17917|klog17917]] * Lightening sensor : No progress * ICA : No progress * Water NN : with Suzuki-kun (meeting slide on 8/13 : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13190|JGW-T2113190]]) |
* Electric monitor |
Weekly PEM meeting
- 2021/09/03(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
- LVK meeting
- 6,7,8,9,10 September
Washimi(poster) LIGO Document G2101778
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU)
- Washimi(NAOJ) in "Environmental physics session"
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- Suzuki (Tokyo) to Kamioka : 8/16-26
General issue
- Interferometer schedule
- Procedure toward X arm commissioning
Pcal finalize->Oplev finalize->Suspension health check->Acceptance check
- IO commissioning
- IMC ASC
- ALS
- IR alignment
- Mid size baffle installation
- Y arm commissioning
- Installed cryopayload to Yend cryostat
- Procedure toward X arm commissioning
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is checking the draft v0
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
XY-end channel assignment JGWDco13125 and cabling
- Preparation of both XY end PEM channel was done
- Channel re-assignment
- Added new ADC to MCF0 and IY0 rack
Summary of PEM channels klog17897
- Box install for SR/OMC area
- Done
- Box install for XY front/end
- Start project
- Seis for BS/OMC
- Is it better to set them to EYC for water analysis?
- Voltage monitor
- Booth MIC setting
- BS, SR done
- Table PEM setting (After IMC ASC commissioning)
- Set calibration factor
- New PEM
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Vibration projection
- Discussion with CAL team about A chamber
- After Rx PD finalization and before closing chamber
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Interferometer commissioning
- Pastavi
- Nishizawa
- Magnetic field analysis
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Suzuki
- Water simulation
- Washimi
- Electric monitor
- Yokozawa
- Temperature at PSL room
- Seismic motion analysis
- O3GK
- Microseismic
- Long term