Differences between revisions 3 and 4
Revision 3 as of 2021-09-03 10:35:32
Size: 3846
Comment:
Revision 4 as of 2021-09-03 10:45:22
Size: 3866
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
   * Kobayashi(OCU)
   * Washimi(NAOJ) in "Environmental physics session"
   * Kobayashi(OCU)   : 14pW3-6
   * Washimi(NAOJ) in "Environmental physics session" 21pN1-6

Weekly PEM meeting

Conference issue

  • LVK meeting
  • JPS meeting url

    • Yuzurihara(ICRR) : 14pW3-5
    • Kobayashi(OCU) : 14pW3-6
    • Washimi(NAOJ) in "Environmental physics session" 21pN1-6
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • Suzuki (Tokyo) to Kamioka : 8/16-26

General issue

  • Interferometer schedule
    • Procedure toward X arm commissioning
      • Pcal finalize->Oplev finalize->Suspension health check->Acceptance check

    • IO commissioning
      • IMC ASC
      • ALS
    • IR alignment
    • Mid size baffle installation
    • Y arm commissioning
      • Installed cryopayload to Yend cryostat
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is checking the draft v0
  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • XY-end channel assignment JGWDco13125 and cabling

      • Preparation of both XY end PEM channel was done
    • Channel re-assignment
      • Added new ADC to MCF0 and IY0 rack
      • Summary of PEM channels klog17897

    • Box install for SR/OMC area
      • Done
    • Box install for XY front/end
      • Start project
    • Seis for BS/OMC
      • Is it better to set them to EYC for water analysis?
    • Voltage monitor
    • Booth MIC setting
      • BS, SR done
    • Table PEM setting (After IMC ASC commissioning)
    • Set calibration factor
  • New PEM
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Vibration projection
    • Discussion with CAL team about A chamber
    • After Rx PD finalization and before closing chamber
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Interferometer commissioning
    • Pastavi
  • Nishizawa
    • Magnetic field analysis
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Suzuki
    • Water simulation
  • Washimi
    • Electric monitor
  • Yokozawa
    • Temperature at PSL room
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/210903/Agenda (last edited 2021-09-03 16:24:44 by tatsuki.washimi)