Differences between revisions 1 and 2
Revision 1 as of 2021-09-10 08:41:34
Size: 3863
Comment:
Revision 2 as of 2021-09-10 08:55:55
Size: 3955
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:

==== Meeting ====
 * After this meeting, we will discuss about Kobayashi-san JPS slide

Weekly PEM meeting

Conference issue

  • LVK meeting
  • JPS meeting url

    • Yuzurihara(ICRR) : 14pW3-5
    • Kobayashi(OCU) : 14pW3-6
    • Washimi(NAOJ) in "Environmental physics session" 21pN1-6
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Meeting

  • After this meeting, we will discuss about Kobayashi-san JPS slide

Business travel

  • Depending on the situation of COVID-19

General issue

  • Interferometer schedule
    • Procedure toward X arm commissioning
      • Pcal finalize->Suspension health check->Acceptance check

      • Commissioning of tower part suspension
    • IO commissioning
    • IR alignment
    • Mid size baffle installation
    • Y arm commissioning
      • Installed cryopayload to Yend cryostat
      • Closed the large flange. Start oplev preparation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is checking the draft v0
  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • XY-end channel assignment JGWDco13125 and cabling

      • Preparation of both XY end PEM channel was done
    • Box install for XY front/end
      • Cabling to Xfront
      • Start project
      • MIC install soon
    • Seis for BS/OMC
      • Is it better to set them to EYC for water analysis?
    • Voltage monitor
    • Booth MIC setting
      • BS, SR done
    • Table PEM setting (After IMC ASC commissioning)
    • Set calibration factor
  • New PEM
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Vibration projection
    • Discussion with CAL team about A chamber
      • 9/21(Tue)
    • Vibration test of OMC chamber
      • Middle of October
      • After arriving the geophone for Yend
      • Chamber closing plan
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Interferometer commissioning
    • Pastavi
  • Nishizawa
    • Magnetic field analysis
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Suzuki
    • Water simulation
  • Washimi
    • Magnetic Field simulation
  • Yokozawa
    • Temperature at PSL room
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo