⇤ ← Revision 1 as of 2021-09-17 10:12:17
Size: 3955
Comment:
|
Size: 3803
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/09/10(Fri) 17:00- | * 2021/09/17(Fri) 17:00- |
Line 7: | Line 7: |
* LVK meeting * [[https://indico.ijclab.in2p3.fr/event/7338/|url]] * 6,7,8,9,10 September * Washimi(poster) [[https://dcc.ligo.org/LIGO-G2101778|LIGO Document G2101778]] |
|
Line 24: | Line 19: |
==== Meeting ==== * After this meeting, we will discuss about Kobayashi-san JPS slide |
|
Line 29: | Line 21: |
* Yokoyama-san 9/28 - 10/01 | |
Line 48: | Line 41: |
* Installed cryopayload to Yend cryostat * Closed the large flange. Start oplev preparation |
* SR3 suspension commissioning * Green Y alignment * Oplev preparation |
Line 74: | Line 68: |
* MAG+MIC+ACC, portable around A and C chamber | |
Line 81: | Line 76: |
* Is it better to set them to EYC for water analysis? | * We will perform the vibration test around OMC chamber. * We will install seismometer at the week of 27th Sep. |
Line 141: | Line 137: |
Weekly PEM meeting
- 2021/09/17(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
JPS meeting url
- Yuzurihara(ICRR) : 14pW3-5
- Kobayashi(OCU) : 14pW3-6
- Washimi(NAOJ) in "Environmental physics session" 21pN1-6
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- Yokoyama-san 9/28 - 10/01
General issue
- Interferometer schedule
- Procedure toward X arm commissioning
Pcal finalize->Suspension health check->Acceptance check
- Commissioning of tower part suspension
- IO commissioning
- IR alignment
- Mid size baffle installation
- Y arm commissioning
- SR3 suspension commissioning
- Green Y alignment
- Oplev preparation
- Procedure toward X arm commissioning
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is checking the draft v0
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
XY-end channel assignment JGWDco13125 and cabling
- Preparation of both XY end PEM channel was done
- MAG+MIC+ACC, portable around A and C chamber
- Preparation of both XY end PEM channel was done
- Box install for XY front/end
- Cabling to Xfront
- Start project
- MIC install soon
- Seis for BS/OMC
- We will perform the vibration test around OMC chamber.
- We will install seismometer at the week of 27th Sep.
- Voltage monitor
- Booth MIC setting
- BS, SR done
- Table PEM setting (After IMC ASC commissioning)
- Set calibration factor
- New PEM
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Vibration projection
- Discussion with CAL team about A chamber
- 9/21(Tue)
- Vibration test of OMC chamber
- Middle of October
- After arriving the geophone for Yend
- Chamber closing plan
- Discussion with CAL team about A chamber
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Interferometer commissioning
- Pastavi
- Nishizawa
- Magnetic field analysis
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Suzuki
- Water simulation
- Washimi
- Magnetic Field simulation
- Yokozawa
- Temperature at PSL room
- Seismic motion analysis
- O3GK
- Microseismic
- Long term