Size: 3926
Comment:
|
Size: 3941
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
* Pcal finalize->Suspension health check->Acceptance check * Commissioning of tower part suspension |
* Suspension health check->Acceptance check * Commissioning of tower part suspension * PCal/TCam finalize * PR3 check |
Line 35: | Line 37: |
* | * |
Line 70: | Line 72: |
* Box install for XY front/end * Cabling to Xfront * Start project * MIC install soon |
* Realtime and medm modification * Bug fix * Useful medm screen |
Line 75: | Line 76: |
* Seis for BS/OMC * We will perform the vibration test around OMC chamber. * We will install seismometer at the week of 27th Sep. |
* Box install for XY front/end * Cabling to Xfront * Start project * MIC install soon |
Line 79: | Line 81: |
* Voltage monitor | * Seis for BS/OMC * Set seismometer around OMC area * Prepare the seismometer around BS (Today?) |
Line 81: | Line 85: |
* Booth MIC setting * BS, SR done |
* Voltage monitor |
Line 84: | Line 87: |
* Table PEM setting (After IMC ASC commissioning) | * Booth MIC setting * BS, SR done |
Line 86: | Line 90: |
* Set calibration factor | * Table PEM setting (After IMC ASC commissioning) * Set calibration factor |
Line 99: | Line 105: |
* Middle of October * After arriving the geophone for Yend * Chamber closing plan |
* 10/5-8 * Geophone will be set 10/4(Mon) * Chamber closing 10/5 |
Line 123: | Line 129: |
* Nishizawa * Magnetic field analysis |
|
Line 128: | Line 131: |
* Investigation of ICA analysis * Progress |
|
Line 135: | Line 135: |
* Investigation of ICA analysis * Progress * Nishizawa * Magnetic field analysis |
|
Line 136: | Line 142: |
* JPS report [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13120|JGW-G2113120]] | |
Line 138: | Line 143: |
* Brief report about Xend PCal hammering test | |
Line 141: | Line 147: |
* Analysis of Xend PCal hammering |
Weekly PEM meeting
- 2021/10/01(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Conference issue
宇宙素粒子若手の会 秋の研究会 URL
- 11/5-7 @ Kashiwa
- Registration Deadline : 10/2
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- Yokoyama-san 9/28 - 10/01
- Kobayashi-san /
General issue
- Interferometer schedule
- Procedure toward X arm commissioning
Suspension health check->Acceptance check
- Commissioning of tower part suspension
- PCal/TCam finalize
- PR3 check
- IO commissioning
- IMC ASC
- IR alignment
- Mid size baffle installation
- Y arm commissioning
- SR3 suspension commissioning
- Green Y alignment
- Oplev preparation
- Procedure toward X arm commissioning
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- NB plot has been finalised
- PWT is checking the draft v0
Reverberation time paper (Washimi+) <<Start writing>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM cabling
XY-end channel assignment JGWDco13125 and cabling
- Preparation of both XY end PEM channel was done
- MAG+MIC+ACC, portable around A and C chamber
- Preparation of both XY end PEM channel was done
- Realtime and medm modification
- Bug fix
- Useful medm screen
- Box install for XY front/end
- Cabling to Xfront
- Start project
- MIC install soon
- Seis for BS/OMC
- Set seismometer around OMC area
- Prepare the seismometer around BS (Today?)
- Voltage monitor
- Booth MIC setting
- BS, SR done
- Table PEM setting (After IMC ASC commissioning)
- Set calibration factor
- New PEM
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Vibration projection
- Discussion with CAL team about A chamber
- 9/21(Tue)
- Vibration test of OMC chamber
- 10/5-8
- Geophone will be set 10/4(Mon)
- Chamber closing 10/5
- Discussion with CAL team about A chamber
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Interferometer commissioning
- Pastavi
- Hoshino
- Seismic motion analysis
- Suzuki
- Water simulation
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Analysis and simulation for the Schumann resonance
- Brief report about Xend PCal hammering test
- Yokozawa
- Temperature at PSL room
- Analysis of Xend PCal hammering
- Seismic motion analysis
- O3GK
- Microseismic
- Long term