==== Conference issue ==== ==== Meeting and Conference issue ====
  * Schumann resonance meeting with Ogawa-san
   * 10/7 (Thr.) 16:00-

  * Next VK PEM meeting
    * 10/28 19:00- (JST)
    * Water NN & Ocean wave

Weekly PEM meeting

Meeting and Conference issue

  • Schumann resonance meeting with Ogawa-san
    • 10/7 (Thr.) 16:00-
  • Next VK PEM meeting
    • 10/28 19:00- (JST)
    • Water NN & Ocean wave

  • 宇宙素粒子若手の会 秋の研究会 URL

    • 11/5-7 @ Kashiwa
    • Registration Deadline : 10/2
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • Yokoyama-san 9/28 - 10/01
  • Kobayashi-san /

General issue

  • Interferometer schedule
    • Procedure toward X arm commissioning
      • Suspension health check->Acceptance check

        • Commissioning of tower part suspension
      • PCal/TCam finalize
      • PR3 check
    • IO commissioning
      • IMC ASC
    • IR alignment
    • Mid size baffle installation
    • Y arm commissioning
      • SR3 suspension commissioning
      • Green Y alignment
      • Oplev preparation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • NB plot has been finalised
    • PWT is checking the draft v0
  • Reverberation time paper (Washimi+) <<Start writing>>

  • ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>

  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM cabling
    • XY-end channel assignment JGWDco13125 and cabling

      • Preparation of both XY end PEM channel was done
        • MAG+MIC+ACC, portable around A and C chamber
  • Realtime and medm modification
    • Bug fix
    • Useful medm screen
  • Box install for XY front/end
    • Cabling to Xfront
    • Start project
    • MIC install soon
  • Seis for BS/OMC
    • Set seismometer around OMC area
    • Prepare the seismometer around BS (Today?)
  • Voltage monitor
  • Booth MIC setting
    • BS, SR done
  • Table PEM setting (After IMC ASC commissioning)
  • Set calibration factor
  • New PEM
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Vibration projection
    • Discussion with CAL team about A chamber
      • 9/21(Tue)
    • Vibration test of OMC chamber
      • 10/5-8
      • Geophone will be set 10/4(Mon)
      • Chamber closing 10/5
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Interferometer commissioning
    • Pastavi
  • Hoshino
    • Seismic motion analysis
  • Suzuki
    • Water simulation
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Analysis and simulation for the Schumann resonance
    • Brief report about Xend PCal hammering test
  • Yokozawa
    • Temperature at PSL room
    • Analysis of Xend PCal hammering
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo