Differences between revisions 1 and 2
Revision 1 as of 2021-11-12 06:45:40
Size: 4557
Comment:
Revision 2 as of 2021-11-12 06:51:51
Size: 4060
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2021/10/29(Fri) 17:00-  * 2021/11/12(Fri) 17:00-
Line 6: Line 6:
==== Important notice ====

 * 文春関係の取材が来たらICRR事務に連絡するようにしてください。
Line 11: Line 7:

  * Yesterday VK PEM meeting
   * 10/28 19:00- (JST)
   * Water NN & Ocean wave
    * Suzuki-san with support of Washimi-san
    * Hoshino-san with support of Yokozawa
Line 25: Line 15:

  * 小柴先生を偲ぶ会
   * 11/7(Sun) 13:00-15:30 [[https://www.s.u-tokyo.ac.jp/ja/event/koshiba-memorial/|url]]
Line 45: Line 32:
 * Kume 10/26 - 10/31
 * Kobayashi 10/24 - 10/31
Line 50: Line 35:
 * Interferometer schedule

 
* Procedure toward X arm commissioning
  * Suspension health check->Acceptance check
    * Commissioning of tower part suspension
   *
PCal/TCam finalize
 * Procedure toward X arm commissioning
  * Suspension health check->Acceptance check
  * Green flash and/or cavity
* Baffle PD check
Line 63: Line 46:
   * Power budget
Line 147: Line 131:
  * Writing paper progress   * Simulation of Schumann resonance

Weekly PEM meeting

Meeting and Conference issue

  • 宇宙素粒子若手の会 秋の研究会 URL

    • 11/5-7 @ Kashiwa
    • Washimi. Kume
  • 第2回新学術「地下宇宙」若手研究会
    • 2021年11月25日(木)~26日(金) @ 神戸大
    • Registration : 11月12日(金)まで
  • Supernovae Workshop (12/1,2)
  • JPS meeting
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19

General issue

  • Procedure toward X arm commissioning
    • Suspension health check->Acceptance check

    • Green flash and/or cavity
    • Baffle PD check
    • Mirror height measurement
      • BS/SR height adjustment
      • Summary of height measurement
    • IO commissioning
      • IMC ASC
      • Power budget
    • IR alignment
      • Beam profile measurement
    • Mid size baffle installation
    • Y arm commissioning
      • SR3 suspension commissioning
      • Green Y alignment
      • Oplev preparation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • PWT has almost finish writing. Colabolator circulation will be soon.
  • Reverberation time paper (Washimi+)
  • ICA for E-run/O3GK (Kume, Yokoyama)
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • Watt monitor
    • Start something?
  • Booth MIC setting
    • BS, SR done
  • Table PEM setting (After IMC ASC commissioning)
  • New PEM
    • Cryocon
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
    • hveto
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Simulation of Schumann resonance
  • Yokozawa
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/211112/Agenda (last edited 2021-11-12 17:05:35 by tatsuki.washimi)