⇤ ← Revision 1 as of 2021-11-12 06:45:40
Size: 4557
Comment:
|
Size: 4060
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2021/10/29(Fri) 17:00- | * 2021/11/12(Fri) 17:00- |
Line 6: | Line 6: |
==== Important notice ==== * 文春関係の取材が来たらICRR事務に連絡するようにしてください。 |
|
Line 11: | Line 7: |
* Yesterday VK PEM meeting * 10/28 19:00- (JST) * Water NN & Ocean wave * Suzuki-san with support of Washimi-san * Hoshino-san with support of Yokozawa |
|
Line 25: | Line 15: |
* 小柴先生を偲ぶ会 * 11/7(Sun) 13:00-15:30 [[https://www.s.u-tokyo.ac.jp/ja/event/koshiba-memorial/|url]] |
|
Line 45: | Line 32: |
* Kume 10/26 - 10/31 * Kobayashi 10/24 - 10/31 |
|
Line 50: | Line 35: |
* Interferometer schedule * Procedure toward X arm commissioning * Suspension health check->Acceptance check * Commissioning of tower part suspension * PCal/TCam finalize |
* Procedure toward X arm commissioning * Suspension health check->Acceptance check * Green flash and/or cavity * Baffle PD check |
Line 63: | Line 46: |
* Power budget | |
Line 147: | Line 131: |
* Writing paper progress | * Simulation of Schumann resonance |
Weekly PEM meeting
- 2021/11/12(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Meeting and Conference issue
宇宙素粒子若手の会 秋の研究会 URL
- 11/5-7 @ Kashiwa
- Washimi. Kume
- 第2回新学術「地下宇宙」若手研究会
- 2021年11月25日(木)~26日(金) @ 神戸大
- Registration : 11月12日(金)まで
- Supernovae Workshop (12/1,2)
- Online
- Registration deadline: November 28, 2021
- JPS meeting
Other meetings url
- GWPAW Hannover, Germany, Dec 14th-17th, 2021
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
General issue
- Procedure toward X arm commissioning
Suspension health check->Acceptance check
- Green flash and/or cavity
- Baffle PD check
- Mirror height measurement
- BS/SR height adjustment
- Summary of height measurement
- IO commissioning
- IMC ASC
- Power budget
- IR alignment
- Beam profile measurement
- Mid size baffle installation
- Y arm commissioning
- SR3 suspension commissioning
- Green Y alignment
- Oplev preparation
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>
- PWT has almost finish writing. Colabolator circulation will be soon.
- Reverberation time paper (Washimi+)
- ICA for E-run/O3GK (Kume, Yokoyama)
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- Watt monitor
- Start something?
- Booth MIC setting
- BS, SR done
- Table PEM setting (After IMC ASC commissioning)
- New PEM
- Cryocon
- Ondotori
- Pt 100 by ondotori
- TEAC710
- 電界計 (EFM; electric field mill)
- ACO power supply with low frequency
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- hveto
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Investigation of ICA analysis
- Progress
- Nishizawa
- Magnetic field analysis
- Washimi
- Simulation of Schumann resonance
- Yokozawa
Temperature at PSL roomklog18416
Analysis of Xend PCal hammeringJGEWDOC13369
Analysis of OMC chamber hammeringJGWDoc11361
- Seismic motion analysis
- O3GK
- Microseismic
- Long term