Line 134: Line 134:
  * Temperature at PSL room[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=18416|klog18416]]
  * Analysis of Xend PCal hammering[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0133/G2113369/002/PCal_ex_200929.pdf|JGEWDOC13369]]
  * Analysis of OMC chamber hammering[[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0133/G2113361/001/OMC_Hammering211014.pdf|JGWDoc11361]]

Weekly PEM meeting

Meeting and Conference issue

  • 宇宙素粒子若手の会 秋の研究会 URL

    • 11/5-7 @ Kashiwa
    • Washimi. Kume
  • 第2回新学術「地下宇宙」若手研究会
    • 2021年11月25日(木)~26日(金) @ 神戸大
    • Registration : 11月12日(金)まで
  • Supernovae Workshop (12/1,2)
  • JPS meeting
  • Other meetings url

  • GWPAW Hannover, Germany, Dec 14th-17th, 2021

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19

General issue

  • Procedure toward X arm commissioning
    • Suspension health check->Acceptance check

    • Green flash and/or cavity
    • Baffle PD check
    • Mirror height measurement
      • BS/SR height adjustment
      • Summary of height measurement
    • IO commissioning
      • IMC ASC
      • Power budget
    • IR alignment
      • Beam profile measurement
    • Mid size baffle installation
    • Y arm commissioning
      • SR3 suspension commissioning
      • Green Y alignment
      • Oplev preparation
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) Check list, slack <<Writing>>

    • PWT has almost finish writing. Colabolator circulation will be soon.
  • Reverberation time paper (Washimi+)
  • ICA for E-run/O3GK (Kume, Yokoyama)
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • Watt monitor
    • Start something?
  • Booth MIC setting
    • BS, SR done
  • Table PEM setting (After IMC ASC commissioning)
  • New PEM
    • Cryocon
    • Ondotori
    • Pt 100 by ondotori
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
    • hveto
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Simulation of Schumann resonance
  • Yokozawa
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/211112/Agenda (last edited 2021-11-12 17:05:35 by tatsuki.washimi)